Примеры использования Flush valve на Английском языке и их переводы на Русский язык
{-}
-
Colloquial
-
Official
He did fix your flush valve.
The flush valve is controlled by level switches.
If Conductivity 1 exceeds this value, then the flush valve will be opened.
FV Flush valve AL Alarm RE Regeneration start.
In respectively steps 8.1 and8.3 you can select that the flush valve must be closed.
The flush valve can be controlled on the basis of conductivity.
If it has not been activated,this connector is controlled parallel with the function“Flush valve 1”.
The flush valve and the output“regeneration start” are not activated.
If the conductivity exceeds the set flush limit(program step 6.1) then the flush valve will be opened.
The flush valve is controlled depending on the measured Conductivity 2.
In step 9 you can set whether the dosing is dependent on the flush valve or on the incoming water meter impulses.
The flush valve is open and the output“regeneration start” is not activated.
Phase“Service” In the“Service” phase the flush valve is closed and any dosing functions can be activated.
Close flush valve 9, put filter system in upright position and empty bucket.
If the second flush control is not activated, the flush valve can also be connected to the“PV” connector.
Concentrate flush valve The concentrate flush valve is attached to connection point"CV.
Possible causes: The system settings have been changed, the modules are soiled,the concentrate flush valve is closed.
If the dosing depends on the flush valve, then the dosing is controlled parallel with the flush valve. .
PU Pump(High-pressure pump running) IV Input valve(System in operation)CV Concentrate flush valve"RINSE" phase.
Determine whether the flush valve of flush control 2 must be closed if input“Low level 2” has been activated.
The main liquid flows into the duct via the concentrate flush valve and via the concentrate control valve. .
The output function“Flush valve 2” is only present(connector“PV”) if the second flush control has been activated.
If the conductivity then falls below this flush limit minus the set hysteresis(step 6.2), then the flush valve will be closed again.
Low level Determine whether the flush valve of the flush control must be closed if input“Low level” has been activated.
If the conductivity then falls below this flush limit minus the set hysteresis(step 6.5), the flush valve will once again be closed.
Flush valve The flush valve is opened in case conductivity is above the set limit value, during a set time.
However, in program step 8.1 you must set that the flush valve should be closed if the low water input has been activated.
Flush valve 2 If the second flush control has been activated, the flush valve for this second control must be connected to the“PV” connector.
During step 8.1 a vertical line should be programmed behind“FL“. Enter whether the flush valve will remain open or closed during the step”Flush alarm“.
If the conductivity remains above the set value during the flush, than the step“Flush alarm” will be activated andcan be chosen to open or close the flush valve.