Примеры использования Ofelectrical networks на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
Inthe Lipetsk region the replica ofthe Victory Banner was handed over toLebedyansky District ofElectrical Networks.
Volunteer fire units are formed ineach District ofElectrical Networks and sections ofsubstations Service ofthe branches.
The equipment has been switched onthat was inthe scheduled maintenance, thus the normal scheme ofelectrical networks has been restored.
Inthe executive office, branches, and inDistricts ofElectrical Networks IDGC ofCentre appointed responsible persons onduty.
Replicas ofthe Victory Banner were placed for eternal storage inall 278 Districts ofElectrical Networks IDGC ofCentre.
All18 Districts ofElectrical Networks(Distribution Zones) ofLipetskenergo are equipped with redundant power supply sources.
Veterans ofGreat Patriotic War- employees ofTverenergo- also presented acopy ofthe Victory Banner torepresentatives ofDistricts ofElectrical Networks.
Another replica ofthe Banner was handed over toEletsky District ofElectrical Networks inthe parade onRed Square inthe city ofYelets ofthe Lipetsk region.
Districts ofElectrical Networks ofIDGC ofCentre- Kostromaenergo division took the relic ofthe Victory with gratitude and respect for eternal storage.
Their reconstruction significantly improved the system tocontrol modes ofelectrical networks, provided the maximum reliability ofthe grid.
All Districts ofElectrical Networks, which are involved inthe election campaign, are provided with redundant power supply sources and their application schemes.
Belgorod direction” asolemn ceremony ofhanding over the Victory Banner toall Districts ofElectrical Networks ofIDGC ofCentre-Belgorodenergo division was held.
Districts ofElectrical Networks ofIDGC ofCentre- Kostromaenergo division took the relic ofthe Victory with gratitude and respect for eternal storage.
Headed byValentina DEN repeatedly won the“Best District ofElectrical Networks” ofBryanskenergo, its industrial base isone ofthe best atthe enterprise.
During the restoration ofpower supply inthe Tver, Yaroslavl,Tambov, Lipetsk and Voronezh regions IDGC ofCentre deployed temporary information centers(TIC) inthe Districts ofElectrical Networks.
Inorder toensure smooth and reliable operation ofelectrical networks monitoring ofequipment conditions and operability ofall power facilities was strengthened.
All Mr. Shumakher's professional activity is aimed ataddressing issues toensure reliable operation ofelectrical networks, innovative solutions and effective projects.
Inevery District ofElectrical Networks ofIDGC ofCentre- Yarenergo division acopy ofthe military relic was placed that keeps the memory ofthe exploits ofthe Russian people inthe fight against fascism.
Atthe moment, the project isstill being implemented totransfer calls ofconsumers from telephones ofgrid operators inDistricts ofElectrical Networks to the single Contact Center for all divisions ofthe Company.
Under Yury Lupin's supervision anumber ofmajor renovations ofelectrical networks of35kV was implemented, considerable work was done toimprove the reliability ofpower supply for customers in7districts ofthe Orel region.
Line operator receives updated data just atthe time ofthe consumer request bycontacting either anoperator ofDistrict ofElectrical Networks orwith the operational headquarters ofthe Electric Grid Company.
During the restoration ofpower supply inTver, Yaroslavl, Tambov, Lipetsk and Voronezh regions,interrupted bythe hurricane wind onMay 1and 2, IDGC ofCenter has deployed temporary information centers(TIC) inthe Districts ofElectrical Networks.
OnDecember 2008, Vladimir was appointed Director for Districts ofElectrical Networks Management ofIDGC ofCentre- Belgorodenergo, and inJanuary 2011 became Head ofStaff ofthe branch's Director.
Innon-competitive discipline- inspection ofpower lines invirgin snow conditions- the winner was Master ofSection for the operation ofcable lines ofSmolensk District ofElectrical Networks ofSmolenskenergo Sergey Potapov.
Ineach ofthe eighteen districts ofelectrical networks ofYarenergo division the work ofthe vehicles ismonitored bythe designated technical staff that monitors the implementation ofthe schedule and route ofmovement and quickly responds tosignals from the crew.
Head ofthe Administration ofZolotukhinsky District ofthe Kursk region, Victor Kozhukhov, thanked the General Director ofIDGC ofCentre, Dmitry Gudzhoyan,for the work aimed atimproving the reliability ofelectrical networks inthe region.
Completely new creation ofelectrical networks involves unbundling ofsupply centres and anextensive 0.4kV network upgrade with afixed power load,network construction using pole-mounted transformer substations and installation boosters on0.4kV power lines.
The company has organized both non-stop monitoring ofthe state ofthe communication channels topower facilities, and the correctness ofthe process equipment operation itself,the reliability oftransmitted and received parameters ofelectrical networks and control features.
One ofthe most ambitious modernizations took place inthe GCC ofIDGC ofCentre- Kostromaenergo division,whose main task iscentralized control ofoperation modes ofelectrical networks, providing maximum reliability and efficiency ofthe grid complex ofthe Kostroma region.
The company has organized around the clock duty ofmanagers and decision-makers, aspecial supervision ofsubstations and power lines has been set, the equipment has been switched onthat was inthe scheduled maintenance,thus the normal scheme ofelectrical networks has been restored.