Примеры использования Verification report на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
Model verification report form for spring brakes.
Period unpaid since verification report.
Model verification report form for diaphragm brake chambers.
A review of obligations is carried out on a quarterly basis to match the verification report processing cycle.
Reflected in the verification report in terms of person-months.
The inspection covered the period from 1 April through 30 June 2009 andis incorporated in the verification report.
Appendix 3: Model verification report form for spring brakes 231.
The emission reductions>and other performance indicators<have been verified and a verification report has been submitted.
Annex 19- Appendix 3- Model verification report form for spring brakes.
If the verification report is not received within six months of the receipt of the notification by the project participants, the Executive Board shall.
The State party notes that the complainant challenged the verification report, maintaining the authenticity of the court documents.
Provide a verification report to the project participants, the Parties involved and the executive board.
Based on the reconciliation results, the system displays the number of verified records and the number of discovered discrepancies,and generates a verification report.
Annex 19- Appendix 1- Model verification report form for diaphragm brake chambers.
The present report provides a brief political overview a detailed account may be found in my eighth verification report, document A/58/267.
Procedures relating to verification report and certification report/request for issuance of CERs version 01.
The IAEA confirmed at that time that the research in question was a relatively minor bit of scientific research being carried out by the Korean scientific corps, and in the same year, 2004,the IAEA issued its annual verification report.
Provide a verification report, including its determinations, to the project participants and the Parties involved.
The verification of the documents was conducted by the Norwegian Embassy, and the verification report was submitted to the complainant through his counsel at the time, for comment.
Make its verification report, including determinations, publicly available through the secretariat, together with an explanation of its reasons.
Once verified, the successful company is entitled to use the ETV Logo, a verification certificate,a technology fact sheet defining conditions of performance, and the verification report in their marketing activities.
Each inspection produces a verification report and confirms the verification and control process during the various stages of the life cycle of a mission.
The Office of Mission Support has accordingly performed a review of the number andqualifications of mission staff responsible for contingent-owned equipment as compared with the verification report workload.
An inspection report i.e., verification report, is prepared by the United Nations Inspection Team after each inspection of a unit/contingent.
Although the Finance Management andSupport Service maintains the memorandums of understanding and claims databases, a verification report database maintained by the Logistics Support Division exists and is used by the missions.
Where a verification report is not submitted within the time frame specified in paragraph 17 above, the Executive Board shall forthwith notify the project participants to provide the outstanding verification report. .
In view of the remaining challenges laid out in the present report and in my previous verification report(A/56/1003), I recommend that the General Assembly approve a renewal of the mandate of MINUGUA from 1 January to 31 December 2003.
Where a verification report determines that a net reversal of storage occurred during the verification period as a result of seepage from the geological storage site of a CCS project activity, the Executive Board shall.
Registered project activities shall not be affected by the suspension orwithdrawal of designation of the operational entity unless significant deficiencies identified in the validation report, verification report or certification related to the CDM project activity constitute the reason for the suspension or withdrawal of the designation.
The DOE shall, based on its verification report, certify in writing that, since its start, the afforestation or reforestation project activity under the CDM has achieved the net anthropogenic greenhouse gas removals by sinks.