Примеры использования Wellbore на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
Decrease drilling tool friction against wellbore walls;
The wellbore is kept at the required distance from the WOC and GOC;
Provides stability of wellbore which contains unstable rocks.
In the process of feeding a mixture formed by highly conductive channels(fracture),connect the wellbore and the formation.
Prepares effectively a wellbore for successful cementing of casings.
Units delivered by ENWA AB produce potable or industrial water from sea,river and wellbore water without use of chemicals.
Extended options of creating project wellbore- now it is possible to specify the interlayer entry point Т0.
Halliburton leads the industry in providing acidizing additives designed for all types of wellbore conditions.
Increased lubricating feature and wellbore walls stability is achieved by using 1st sort emulsion.
Intrusion of water from emulsive mud to formation andinteraction of shale rocks with water promotes the decreasing of wellbore stability.
River and wellbore water maker depending on the type produce from 0.7 to 200 m³ of potable water per day.
Pm CDT- Gas, oil andconcrete from the Deepwater Horizon explode up the wellbore onto the deck and then catches fire.
While creating target-point the project wellbore is created, for which the profile, purpose, status and tolerance parameters are specified.
It has high flushing ability resulting in effective preparation of a wellbore for successful cementing of casings.
First of its kind, pipeline and wellbore diagnostics technology that provides fast, accurate insight without physical intervention.
Judging by the time difference between the first entries of transverse and pressure waves,it is determined which rock lays down the wellbore walls with the placed probe.
Point contact of centralizers' centering elements with wellbore walls decreases friction force during the pipe descending.
High quality of wellbore cleaning is provided by using specially selected non-ionic polymers, structureforming agents and fi ltrate agents.
Algorithmic procedures for planning of logging in an open wellbore for solving of petrophysical objectives 3.
A driller monitors the work of driller assistants who assemble the so-called‘suspender'- they assemble andsuspend a drill pipe before running it into a wellbore.
The most important aspect in wellbore construction is creating and maintaining wellbore integrity and zonal isolation.
Development involves change in permeability and porosity of the PPP,which is separated from the wellbore packer, pressure pulses from atmospheric pressure to 70 MPa.
In the productive zone or in the wellbore, QUICK-STONE remains in the liquid state, but outside the wellbore, the product immediately passes into a solid state.
Sodium polyacrylate molecules adsorbs in clay particles andbind them thus creating a net from polymer and clay on wellbore walls and eff ectively reducing mud fi ltration.
The casing provides stability to the newly drilled wellbore and isolates potentially dangerous high pressure zones from each other and from the surface.
The multi-drop system provides simple andreliable zonal control of up to 12 interval control valves in a single wellbore, using a minimum number of control lines.
A specific sample method for determining the depth of the horizontal wellbore under the seabed, on the basis of preventing rock fracture and mud water pollution was also proposed and tested.
As the drilling fluid circulates back to surface outside the drill pipe, it sweeps up the generated rock"cuttings" andhelps preventing destabilization of the rock in the wellbore walls.
Customized to specific well needs,SUPER-SAT™ fluid provides reduced dilution, wellbore stability, CO2 tolerance and reduction of salt creep.
The casing is inserted into the wellbore andcemented to help the wellbore separate the formation and prevent the wellbore from collapsing, while ensuring that the drilling mud circulates for drilling.