Приклади вживання Fourth reactor Англійська мовою та їх переклад на Українською
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
There were two explosions on the fourth reactor.
The fourth reactor of the Chernobyl nuclear power plant just exploded.
Specially designed super cranes fixed it over the fourth reactor.
The fourth reactor at the Chernobyl nuclear power plant had just exploded.
This shift was the last to work on the control panel of the fourth reactor.
The third and fourth reactors are also going to come up at Kudankulam.
They visited Pripyat, Chernobyl, and Chernobyl-2,the„Duga" and„Sarcophagus" above the fourth reactor of the power plant.
Th April 1986 at 1:23 am the fourth reactor of Chernobyl nuclear power plant exploded.
The NSC will serve at least 100 years andwill help solve the problem of disassembling of the sarcophagus over the fourth reactor.”.
The explosion of the fourth reactor block of Chernobyl occurred on the night of April 26, 1986 1 hour 26 minutes.
Shelter-2”, or Arch, covering the old sarcophagus of the fourth reactor, is the world's largest mobile structure.
After the Velvet revolution in 1990 the Czechoslovakiangovernment decided to cease construction of the third and fourth reactors.
It turns out that just 25 seconds before the explosion of the fourth reactor, many seismic stations scattered across the globe recorded a strange high-frequency seismic wave.
The Chornobyl Shelter Fund was created in 1997 to help Ukraine build anew containment shelter over the ruins of the plant's fourth reactor.
The fourth reactor of the Chernobyl nuclear plant in Ukraine, then part of the Soviet Union exploded April 26, 1986, causing the appearance of a cloud of radioactive dust over Europe.
Ukraine officially opened the first solar power plant, built in the Chernobylexclusion zone almost in front of the sarcophagus over the fourth reactor exploded in 1986.
In the professional slang of the Chernobyl NPP personnel studying the collapse of the fourth reactor, the concept of“stalker” is a scientist, a professional, studying the ruins of a destroyed reactor. .
Just yesterday American and Japanese experts claimed the possibility of a critical scenario for“Fukushima-1‘due to thefact that the pools of spent fuel of the third and fourth reactors, no more water.
Built power plant has about 3.8 million solar panels,located on the territory of 1.6 hectares around the fourth reactor of the Chernobyl nuclear power plant- a hundred meters away from the sarcophagus that covers it.
Since then, the fourth reactor, 200 tons of nuclear fuel, 43 thousand cubic meters of highly radioactive waste, 630,000 of radioactive waste and four tons of radioactive dust will be buried at least for 100 years.
Pripyat before and after the Constructed power plant has about 3,8 thousand solarpanels located in the territory in 1,6 hectares around the fourth reactor of the Chernobyl NPP- in hundred meters from a sarcophagus which covers him.
The explosion had destroyed the fourth reactor of the station, there was a release into the environment of radioactive substances, including isotopes of uranium, plutonium, iodine-131, cesium-134, cesium-137(halflife 30 years), strontium-90(half life 28 years).
Last April marked the 33rd anniversary of the Chernobyl disaster in then-Soviet Ukraine,caused by a botched safety test in the fourth reactor of the atomic plant that sent clouds of nuclear material across much of Europe.
The huge dome-shaped building, known among specialists as the New Safe Confinement, covered the old Chernobyl“sarcophagus” to thenext 100 years to protect the emergency fourth reactor of Chernobyl, radiation equipment, nuclear waste residues and dust.
Chernobyl Atomic Electric Power Station accident- on April 26, 1986, during the design tests,the explosion occurred that completely destroyed the fourth reactor of the station and caused significant contamination of the surrounding area with radioactive substances;
What is happening now with the fourth ChNPP reactor can be known in person.
It is planned that in 2019-2021, the active zones of the first,third, fourth and fifth reactors of Zaporizhia NPP will completely have U.S. nuclear fuel.
According to the company's plans, in 2018 it is planned to increase the loading ofWestinghouse fuel to the core of the fifth reactor with to three fourth of the total volume, and the first and third reactors to a half.