Приклади вживання Sprints Англійська мовою та їх переклад на Українською
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
Sprints in Scrum.
Energetic sprints ahead Aprilia.
She's probably going back to sprints.
A2 sprints back to the base cone.
Shorten the grids to work on sprints and agility.
A2 sprints out to cone 1 first.
At the same time the first red sprints through his gate.
A2 sprints back to the base cone.
Each road stage has two sprints- the Traguardi Volanti.
R1 sprints away to avoid A1 and joins the end of a wall.
Finishing with Sprints 21 February 2014.
A1 sprints and attempts to prevent the ball from going through the gate goal.
The product has no development sprints, outside libraries, test coverage.
A2 sprints back to the base cone and places a foot either side of the base cone.
R2 is bounced off the other end of the wall and sprints away to avoid A1.
A2 then sprints to an open line.
Subjects were asked to perform cycling sprints after the loading period.
A1 then sprints to another open line.
Sprints and collect all the money you find, attack your enemies by jumping on them.
A1 turns and sprints towards the top gate.
Sprints help plan through the inspection and adaptation of progress towards the Sprint Goal at least once a month.
Alter the jogging sections to cruises or even sprints to turn this into a fitness activity.
A1 then sprints out the grid around an outside cone and returns into the playing area.
His personal records for both sprints were set in 2014, when he timed 10.73s and 21.76s respectively[5].
The sprints were unquestionably impressive, but their brevity was what had allowed the cheetahs to be captured and brought to England in the first place.
We constantly hurry somewhere, as if we run sprints on the way of life and are afraid to be late in some extremely important place.
A1 turns and sprints back to the line they just tagged and tag that line again.
Description: Challenge your oppositions in sprints, races and freestyle modes showing off your best tricks to cross the line ahead of the pack.
We work in sprints to control project scope.
The point distribution for the sprints are as follows: The Young rider classification is restricted to the riders that are under the age of 25.