Примери за използване на Balancing capacity на Английски и техните преводи на Български
{-}
-
Colloquial
-
Official
-
Medicine
-
Ecclesiastic
-
Ecclesiastic
-
Computer
The determination of the amount of balancing capacity shall.
The procurement of balancing capacity shall be performed by the transmission system operators.
The specific volume of balancing capacity to which the exemption would apply;
The price of balancing energy shall not be pre-determined in contracts for balancing capacity.
(b) specification of the volume of balancing capacity for which the exemption would apply;
Regional operational centres are also envisioned to support the TSOs of the system operation region in procuring the required amount of balancing capacity.
The procurement of balancing capacity shall be performed on a regional level in accordance with point 8 of Annex 1.
The contracting shall be performed for not longer than one day before the provision of the balancing capacity and the contracting period shall have a maximum of one day.
The procurement of balancing capacity shall be performed by the transmission system operator and may be facilitated at a regional level.
Must not increase the reliability margincalculated pursuant to Regulation(EU) 2015/1222(CACM Guideline) due to the exchange of balancing capacity or sharing of reserves.
Derogations from the obligation to base the procurement of balancing capacity on use of primary markets shall be reviewed every three years.
Transmission system operators shall not increase the reliability margincalculated pursuant to Regulation(EU) 2015/1222 due to the exchange of balancing capacity or sharing of reserves.
In order to enable TSOs to procure and use balancing capacity in economically efficient and market-based manner, there is a need to foster market integration.
TSOs shall not increase the reliability margin calculated pursuant to Regulation(EU)2015/1222 due to the exchange of balancing capacity for frequency restoration reserves and replacement reserves.
The contracting for the balancing capacity must be performed for not longer than one day before the provision of the balancing capacity and the contracting period must have a maximum period of one day.
The contracting shall be performed for not longer than one day before the provision of the balancing capacity and the contracting period shall have a maximum of one day.
Take into account the volumes of required reserve capacity that are expected to be provided by balancing energy bids,which are not submitted based on a contract for balancing capacity.
The contracting of the remaining part of the balancing capacity shall be performed for a maximum of one month in advance of the provision of balancing capacity and shall have a maximum contractual period of one month.
Regional operational centres shall support the transmission system operators of the system operation region in procuring the required amount of balancing capacity determined in accordance with point 8.1.
The reservation of cross-zonal capacity for the exchange of balancing capacity shall be limited to 5% of the available capacity for the exchange of energy of the previous relevant calendar year between the respective bidding zones.
Procurement of balancing capacity shall be based on a primary market unless and to the extent that the regulatory authority has provided for a derogation to allow the use of other forms of market-based procurement on the grounds of a lack of competition in the market for balancing services.
With regard to balancing markets, efficient andnon-distortive price formation in the procurement of balancing capacity and balancing energy requires that balancing capacity contracts do not set the price for balancing energy.
The procurement of balancing capacity shall be market-based and organised in such a way as to be non-discriminatory between market participants in the prequalification process in accordance with Article 40(4) of Directive(EU) 2019/944 whether market participants participate individually or through aggregation.
If the exemption is allowed, for at least 40% of standard balancing products anda minimum of 30% of all resources used for balancing capacity, contracts for the balancing capacity shall be concluded for no longer than one day and a day before the supply.
Contracts for balancing capacity shall not be concluded more than one day before the provision of the balancing capacity and the contracting period shall be no longer than one day, unless and to the extent that the regulatory authority has approved the earlier contracting or longer contracting periods to ensure the security of supply or to improve economic efficiency.
Where a derogation is granted, for at least 40% of the standard balancing products anda minimum of 30% of all products used for balancing capacity, contracts for the balancing capacity shall be concluded for no more than one day before the provision of the balancing capacity and the contracting period shall be no longer than one day.
Where cross-zonal capacity is allocated for the exchange of balancing capacity or sharing of reserves pursuant to Article 6(8) of this Regulation, transmission system operators shall use the methodologies developed in the guideline on electricity balancing adopted on the basis of Article 6(11) of Regulation(EC) No 714/2009.
At the request of the transmission system operator, the regulatory authority may decide to extend the contractual period of the remaining part of balancing capacity referred to in paragraph 9 to a maximum period of twelve months provided that such a decision is limited in time, and the positive effects in terms of lowering of costs for final customers exceed the negative impacts on the market.
By contrast, it is possible to perform the market-based allocation process where the contracting is carried out not more than one week in advance of the provision of the balancing capacity and to perform the allocation based on an economic efficiency analysis where the contracting is done more than one week in advance of the provision of the balancing capacity, provided that the volumes allocated are limited and that an assessment is carried out annually.