Примери за използване на Installation work на Английски и техните преводи на Български
{-}
- 
                        Colloquial
                    
 - 
                        Official
                    
 - 
                        Medicine
                    
 - 
                        Ecclesiastic
                    
 - 
                        Ecclesiastic
                    
 - 
                        Computer
                    
 
Features of installation work.
All installation work will not take a few minutes.
Easy transportation and installation work.
The installation work is carried out by members of the military.
It is used for repair, installation work.
Installation work should be carried out in soft shoes;
Or in his increasingly ambitious installation work.
After finishing installation work comes the phase of testing.
The following diagram provides the installation work.
For construction and installation work requires a corresponding project.
Laying floorboard: preparatory and installation work.
Installation work for laying floor slabs consist of the stages.
It helps save extra fittings and installation work.
For installation work, in addition to the stairs, you will need a set of tools.
Light weight. This factor significantly simplifies installation work.
Before installation work, you must carry out a number of preliminary activities.
Documentation kit, regulating construction and installation work.
Before installation work necessary to prepare the surface of walls correctly.
Therefore the price of the set does not include the installation work.
Before installation work, necessary to carry out a number of preliminary activities.
Balancing pulleys are done after the completion of installation work.
And the idea that you have done the installation work yourself will please you even more.
Accordingly, it makes little effort to perform all installation work.
Start of construction and installation work is scheduled for March-April 2012 years.
Bracelet holder with strong magnets for construction and installation work.
All installation work ceiling are simple enough for beginners in the construction business.
For lifting andmoving of sandwich panels with the installation work;
At the initial stage of installation work, the angle between the walls is necessarily measured.
The unit includes the water pump for saving installation work in user side.
After completion of all installation work is carried idle start the washing machine.