Примери за използване на Road junctions на Английски и техните преводи на Български
{-}
-
Colloquial
-
Official
-
Medicine
-
Ecclesiastic
-
Ecclesiastic
-
Computer
The number of road junctions: 3pcs;
The facilities must be positioned at not less than 3 km before or after the road junctions.
A total of 7 tunnels, 21 viaducts,4 road junctions and 12 underpasses and overpasses will be built.
Ten large facilities will be built,two of which at the Kalotina and Dragoman road junctions.
The landscape shaping of the road junctions is executed with clusters of coniferous and deciduous trees and shrubs.
A powerful variable snow plough for clearing large areas and road junctions of snow.
The total length of all the road junctions of the Adjoining Infrastructure to Danube Bridge Vidin-Calafat is 760, 89 m.
Prepared or in the process of completion of the road bed are the rest of the overpasses or road junctions.
In total under the project have been built 5 road junctions, 9,bridges, 36 overpasses, 15 underpasses and 3 crossings of railways.
Five road junctions and six connections between the two routes and connections to all settlements will be provided, Nankov said.
In addition, it is worth recalling that you need to take a navigator, since the road junctions around Milan are rather complicated.
Overall, five road junctions are being constructed as are two river bridges, two overpasses, an underpass, and three roundabouts.
The adjustable blade geometry offers flexibility in snow clearing in confined space such as car parks or road junctions. Sturdy and safe.
All road junctions are executed in conformity with the Rules for Design of Buildings and Structures in Seismic Areas, in force since 1987.
The projects include the provision of lighting of streets andboulevards in towns, villages, parks, road junctions, resting grounds, sports facilities.
Part of the road junctions and overpasses of the Adjoining Infrastructure to the bridge are put into commissioning, and the rest are at their last construction phase.
Three tunnels with total length 1260 m, 26 bridges andviaducts with total length 6 000 m as well as 3 road junctions and reinforcing walls with total length of 2 762 m will be built on the road. .
Infrastructure works include the construction of new freight railway station and 7 km new railway line,reconstruction of existing railway station and construction of four road junctions on two levels.
The road junction includes part of the direct routes to Calafat- Sofia andVidin-Bregovo and other road junctions in the direction of Vidin-Calafat, Sofia-Vidin-Kula and others, with total length of over 2000 meters.
Where the motorway intersects with another road or railway line, it always happens at different levels, and the entry andexit from the motorway is done solely and only at road junctions, as some of them are ramps.
The new construction will comprise three road junctions, five river bridges, five road overpasses, five road underpasses, two rail overpasses, one rail underpass, 17 km of noise protection walls and 10 service or rest areas.
The execution of the adjoining overhead railway road and the approaches to the bridge,the construction of sections, road junctions and installations of the adjoining road and railway infrastructure to the bridge are advancing.
Contract 2- Construction of the adjoining road and railway infrastructure which covers: new railway freight station and 7 km of new railway line,reconstruction of the existing passenger station and construction of 7 new two-level road junctions.
For position I- 1 rest area,2 road junctions, 18 agriculture and road underpаsses and overpаsses, 8 bridge structures with total length of 2 300 m, 1 tunnel with total length of 830 m, 3 archeological sites near the project alignment;
Innovative approaches will be applied in the construction of the route to the East of the gorge;a by-pass around Kresna will be constructed, 5 road junctions with two connections between the two sections, and road junctions to all towns along the gorge will be constructed.
For position II- 3 rest areas,2 road junctions, 16 agriculture and road underpаsses and overpаsses, 10 bridge structures with total length of 5 630 m, 2 tunnels with total length of 2 000 m(1 200 m и 800 m), 5 archeological sites near the project alignment.
Since licensing the company has exercised construction supervision over more than 200 sites as land-sliding zones, strengthening and coast reclamation works, underground communications, administrative andresidential buildings, road junctions, foundation and protective works, warehouses, factories and industrial plants. Presently the company continues this area of work.
Services subject of the signed contract include carrying out supervision of the design and build of Struma motorway, Lot 3.3 with approximate length 23.6 kilometers, with the respective earthworks, reconstruction and relocation of underground and surface communications and facilities, relocation of roads, small structures, fences, embarkments, concrete and armoured concrete retaining walls, armoured walls, bridge structures,overpаsses and underpаsses, road junctions and a system of regional management of road infrastructure.
The road junction,“trumpet interchange”, is constructed according to the project“Danube Bridge Vidin-Calafat”.
Road junction Nadezhda- Central Railway Station.