Ví dụ về việc sử dụng Opened to traffic trong Tiếng anh và bản dịch của chúng sang Tiếng việt
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
The bridge opened to traffic in May 2007.
Construction on Runway 17R/35L began in 2004 and opened to traffic in September 2005.
SMART opened to traffic on 14 May 2007, after four years of construction.
This cable-stayed bridge opened to traffic in 2002.
It was opened to traffic in March of 2013 and supposedly in the shape of a leaping dragon, complete with a head.
Tunnels are to Pangyo Junction, and opened to traffic on 31 October 1991.
General Director of Highways Abdulkadir URALOĞLU stated that the projects carried out worldwide as an organization, highway projects that have the most width in their field,there is an important part of them completed and opened to traffic, said that some of the work continued.
The bridge was opened to traffic in October 1997.
On November 13, 1998, after 22 years of construction,Trasa Kwiatkowskiego was opened to traffic from ul. Morską to ul. płk.
Shortly after the bridge opened to traffic, passengers were stopping to admire the landscape and the bridge itself.
In March 2012 the section forming the bypass of Stawiski(6,5 km long)was put out to tender,[4] and it opened to traffic in December 2013 as a single carriageway road.[5].
In the Spring of 2019, the part opened to traffic consists of three separate sections, forming the bypasses of Suwałki/Augustów, Szczuczyn and Stawiski.
The reconstruction of the 207 National Highway in the north-south direction through the park to the urbanarea has been fully completed and opened to traffic, and the traffic is fast and convenient.
The bridge has been opened to traffic since September 2017.
It opened to traffic in August 2012.[18] The construction of the section between Warsaw and Mińsk Mazowiecki is planned to take place between 2014 and 2020.[19] The remaining part to the border will be built some time after 2020, with the section between Mińsk Mazowiecki and Siedlce likely starting first because of higher traffic density.
Two stretches of the Southern Warsaw Bypass opened to traffic in July 2013 and September 2013, respectively.
In June 2013 S3 was extended further and opened to traffic to reach from the"Świebodzin South" interchange to the existing stretch of the S3 expressway at Sulechów.
In May 2017, the continuation of the S5 from the end of the easternbypass of Poznań to just north of Gniezno opened to traffic, thus diverting most transit traffic away from Gniezno itself.
In May 2013, Interchange with S3(Jordanowo) was opened to traffic.[9] First stretch is between the interchange with the A2 motorway and the"Świebodzin North" interchange.
For a while it was not clear whether even this limited goal would be reached,but the motorway opened to traffic in June 2012 after very intensive construction work in the final few months.
The second section to open was part of thebypass of Augustów, finished and opened to traffic in November 2014. The extension of this section was the bypass of Suwałki opened in April 2019[3].
July 1969: Gajwa~Incheon Port segment open to traffic.
New highway along Yellow River opens to traffic.
December 1998: Seoksu IC~Sammak IC segment opens to traffic.
October 2009: Incheon Grand Bridge opens to traffic.
June 2013: Cheongra IC opens to traffic.
As of Summer 2018 the portion open to traffic runs from Puławy to Lublin.
December 1990: Construction Begin 6 July 1994:Neunghae IC~Gwangmyeong IC segment opens to traffic.
July 2009: Construction Begin(E. Chungju IC~ Jecheon JC/ S. Jecheon IC) 24 July 2009:N. Jincheon IC opens to traffic.