Eksempler på bruk av Rig will på Engelsk og deres oversettelse til Norsk
{-}
-
Colloquial
-
Ecclesiastic
-
Ecclesiastic
-
Computer
The rig will be in service during 2015.
Following drilling on Havis, the rig will drill an appraisal well on Skrugard.
The rig will be towed to land in due course.
The supply base for the Transocean Enabler drilling rig will also be in Hammerfest.
The rig will be considered for operation on several licences.
State-of-the-art rig will drill six Nova wells.
The rig will remain at Ølen for four to six weeks for repair work and equipment installation.
Under the terms of the new contract, the rig will be used by Statoil until August 2015.
The rig will play an important role in Statoil's efforts to reach its NCS production targets.
Transport of personnel to and from the rig will be carried out by Norsk Helikopter AS from Brønnøysund.
The rig will have catering capacity for personnel involved in both drilling and installation activities.
Once P&A operations are completed the Maersk Developer rig will move to the impact Perseus prospect in De Soto Canyon(DC) 231.
The rig will be a highly anticipated contribution to the rig fleet on the Norwegian continental shelf(NCS).
After Transocean Spitsbergen has completed the Saturn well the rig will cut and retrieve a wellhead in the Mercury exploration well.
The drilling rig will be dismantled and removed from the site when this intermission begins.
This Spreader Frame is also designed for where there are height restrictions,as the height of the rig will be lower than a'1 over 2' rig. .
The semi-submersible rig will be deployed to start drilling from Q3 2012.
Det norske oljeselskap ASA, as a 20 percent license partner in PL 554,confirms that the Borgland Dolphin rig will now drill a sidetrack well(34/6-2A).
The rig will now continue drilling at Ivar Aasen field, with appraisal well 16/1-22 S in the western part of the field.
To reduce the challenge that the distance to shore represents, the supply boats surrounding the rig will have more emergency equipment on board than they normally carry on the Norwegian continental shelf.
My rig will generate a lot of heat, so you have anything that's yours that's nearby that's pharmaceutical, it will fry it. Is this yours?
West Hercules is the first-available suitable rig which is already in operation. This, together with its advanced capabilities such as deep waters, high pressure/high temperature and completion, has prompted Statoil to act on this opportunity.This modern rig will be complementary to our portfolio and bring us more flexibility. It will be utilised on targeted wells internationally and on the NCS.”.
D_rig will work continuously with research and innovation to develop recycling processes that are environmentally optimized.
After completion of Skavl, the drilling rig will move 16 kilometres north to drill the Kramsnø prospect which is the last of the four prospects scheduled to be tested in 2013.
The jack-up rig will mainly be used to add bed capacity on the field, but may also be used for drilling-related tasks.
The rigs will be owned by the Gullfaks and Oseberg licenses, but will be operated by a drilling contractor.
But calculations show that these rigs will call for 4 000 additional crew with the right expertise over the next two-three years.