Exemple de utilizare a Formwork can în Engleză și traducerile lor în Română
{-}
-
Colloquial
-
Official
-
Medicine
-
Ecclesiastic
-
Ecclesiastic
-
Computer
-
Programming
The formwork can be of the following types.
After 4-5 days, the formwork can be removed.
The formwork can be removed after a week.
The construction of expanded polystyrene formwork can be called simple.
Formwork can be removed not earlier than a week.
To manufacture the formwork can be second-rate or slate boards.
Formwork can be disassembled not earlier than a week after pouring.
Even less experienced users of system formwork can work quickly and efficiently with DUO.
The formwork can be removed if the strength is set.
Long service life- laminated plywood moisture resistant for formwork can be used up to 100 times.
Formwork can be removed only after the foundation will gain 70% strength.
Down to a vertical radius of 70 m, the cooling-tower formwork can climb through curves unhindered.
After drying, the formwork can be removed, but the foundation will be fully prepared to just one month.
After about 10 days after pouring(concrete during this time should gain about 60-70% strength), the formwork can be dismantled.
The site-ready, pre-assembled elements(one each for the inside and outside formwork) can be continuously adjusted with reference to a flexible template, to set radii of down to 3.50 m.
The desired strength it would gather additionally already in place, andthe material is removed the formwork can be used for further work?
When the formwork can be used non-removable panels made of polypropylene, they simultaneously serve as thermal insulation of walls of the cap, which is important when applying it residential pomescheniy.
The most economical material for formwork is wood, but even a foam polystyrene formwork can be installed that will perform the functions of thermal insulation.
Steel formwork panel can easily be erected by unskilled labour.
The shape and dimensions of formwork geometries can be flexibly adjusted to the topography and landscape.
Disposal If necessary, Doka takes care to properly dispose of formwork that cannot be re-used or repaired.
Thanks to its practical constructional design, Climbing formwork MF240 can be adapted to highly diverse requirements, easily and very flexibly.
Construction companies can use formwork designs supplied by Doka in their own Revit model without any loss of data.