Examples of using Formwork can in English and their translations into German
{-}
-
Colloquial
-
Official
-
Ecclesiastic
-
Medicine
-
Financial
-
Ecclesiastic
-
Political
-
Computer
-
Programming
-
Official/political
-
Political
It almost goes without saying that even second-hand formwork can be implemented for at least a further decade.
The formwork can be adjusted down to the last millimetre.
Thanks to its individual components, the formwork can be set up and aligned by one person without difficulty.
The formwork can be transported in a space-saving way and stored on the building site.
Due to the large choice of formwork elements with different heights andwidths, the formwork can be installed into the system within precisely 1.0 cm of the architect measurements given.
Lost formwork can be easily installed in both brick walls and concrete surfaces.
To open the formwork, it's sufficient to open the clamping device on a single side. The formwork can be folded out thereafter and moved to the next location with a single crane motion.
The formwork can be wetted with the oil a few days before or immediately prior to concreting.
To manufacture the formwork can be second-rate or slate boards.
The formwork can be tailored flexible from the layout and the need of the constructor.
Hence, if required the formwork can also achieve lengths of up to 12 m.
Our formwork can be supplied as narrow boards and wide boards. Additionally, we also deliver short boards for smaller length formwork. .
By doing this, the formwork can be better adapted to a slanted or uneven bottom.
The polystyrene formwork can be set up with different types of systems, ranging from panels with tie, large surface panels or iron framework.
The waiting period until formwork can be stripped can last 5 minutes, or up to 28 days.
Non-absorbent formwork can neither moisture nor bigger amounts of release agent if concrete absorb.
After the hardening of the component, the formwork can be removed and it offers a variety of processes for subsequent treatment of concrete surfaces.
After drying, the formwork can be removed, but the foundation will be fully prepared to just one month.
This means that expensive formwork can be more efficiently used and the energy balance of heat treatment considerably improved.
Through different application formwork can produce an interesting effect because every formwork produces individual surfaces.
In order to save large amounts of concrete the formwork could be adjusted to different shapes.