Examples of using Engineering plan in English and their translations into Arabic
{-}
-
Colloquial
-
Political
-
Ecclesiastic
-
Ecclesiastic
-
Computer
Accrediting Engineering plans 2016- 777.
Engineering plan for the building from the engineering office agreed with.
Institutions Licensing, Engineering Plans.
Integrated engineering plans for the project.
Geopolitical and Social Engineering Plan.
Engineering plan of the facility specified by the measurements and the numbers of licenses for doctors.
Sealed and approved engineering plans by the competent authority.
Engineered plans Based on AS/NZS 4600 standard engineering plan.
Well, let's see, he's got engineering plans, soil reports, inspection updats.
According to customer's various conditions,we can provide suitable engineering plan.
The Advisory Committee recalls that the engineering plan for UNAMID comprises three stages.
A bidding exercise should be initiated prior to deployment andappropriate space designated in initial engineering plans.
The Operation ' s engineering plan called for the construction of office facilities and accommodation for troops and formed police units.
We designs your house or villa or any other projects from A: Z(illustrations, engineering plans, architectural and construction designs).
Engineering plans were mainly affected by the continuing security challenges and related movement restrictions within Mogadishu as well as between the sectors.
Formed troops provided withimproved accommodation facilities as a part of the four-year engineering plan to improve living conditions of the troops.
The engineering plan was geared towards the construction of hard-wall accommodation for eligible military, police and civilian personnel as well as the refurbishment of team sites.
(c) Sewage trucks, for the fortnightly removal ofwaste from the 110 septic tanks envisaged in the engineering plan;
Provide technical recommendations on fire prevention and protection in the engineering plans of new facilities within the aerodrome and prepare reports thereon.
The engineering plan of the Operation also included the construction of airport terminals, aprons and taxiways at El Fasher, Nyala and El Geneina airports, as well as the construction of 34 helipads.
Implemented second phase of the Force ' s four-year engineering plan; install 21 new prefabricated accommodation, ablution and kitchen units.
The Operation ' s engineering plan also included the expansion and/or renovation of aprons, taxiways and airstrips, including parking areas and terminal facilities in Nyala, El Fasher and El Geneina, as well as the planned construction of 24 helipads.
This will provide the framework for early consideration ofimportant issues such as rules of engagement, logistics and engineering plans. The provision of military maps from either United Nations sources or by Member States with the necessary capability is essential.
The Operation ' s engineering plan includes a provision for the expansion and/or renovation of the apron spaces in airfields that are required by UNAMID, as well as the upkeep and maintenance of helipads.
NMR Consultancy provides afactory-ready cabling solution with a clear and concise engineering plan to customize it according to your needs- from inside the factory to the outside factory, controlling access to CCTV, and copper to fiber.
The engineering plan for the construction of new camps comprises three stages:(a) short-term workplan up to the end of December 2008;(b) medium-term workplan from January to June 2009; and(c) long-term workplan from July 2009 to June 2010.
In the light of the pattern of expenditure and the revisions to the engineering plan, the Advisory Committee considered that the utilization of resources for facilities and infrastructure was likely to be up to 10 per cent lower than projected by the Secretary-General.
Other projects of the engineering plan, such as the construction of community policing centres, asphalt access roads to supercamps and helipads, have also slipped beyond their expected completion dates and will continue into 2011/12, owing to a lack of necessary technical information as a result of engineering capacity constraints land issues, which in some cases have remained unresolved after the awarding of contracts; and security constraints that have delayed the mobilization of contractors to the sites.
The originally envisaged multi-year engineering plan for the construction of new camps comprised three stages:(a) a short-term workplan, up to December 2008;(b) a medium-term workplan, from January to June 2009; and(c) a long-term workplan, from July 2009 to June 2010.