Examples of using Contract included in English and their translations into Danish
{-}
-
Colloquial
-
Official
-
Medicine
-
Financial
-
Ecclesiastic
-
Official/political
-
Computer
The contract included fully equipment i.e.
Construction period: 2009-2010 Engineer:COWI A/ S Info Overview The contract included the construction of 2 pcs.
The contract included the construction of 2 pcs.
Construction period: 2014-2015 Engineer: NIRAS A/S Info Overview The contract included the first stage of an expansion of Ishøj Harbour on the Lake area west of"Vandhunden.
The contract included the establishment of a new path tunnel.
Construction period: 2010-2012 Engineer: COWI A/ S Info Overview The contract included the construction of a new highway from high way 3 in the east to"Nordre Ringvej" in the west.
The contract included the construction of a by-pass west of Slagelse.
In connection with the construction of a new business area about 10 acres of land were prepared. The contract included the excavation of the existing road and construction of a new road system.
The contract included the construction of stage 2 of the“Svanemølle route”.
Construction period: 2012-2013 Engineer: Hundsbæk& Henriksen A/ S Info Overview This contract included the execution of sewage pipes and water supply in the allotment association by Pilegård Alle, located at Pilegård Alle, Tårnby.
My contract included killing Palmer. I wanna make good on it.
Construction period: 2009-2010 Engineer:MOE& Brødsgaard A/S Info Overview The contract included the reconstuction and expansion of the preserved property"Favrholm" by Hillerød to a new and modern conference center for NOVO.
The contract included the establishment of traffic flow during the constructional phase.
A/ S Info Overview The contract included the establishment of a new artificial turf facility at Rådmandshaven in Roskilde.
The contract included the construction of a by-pass west of Slagelse.
The contract included the excavation of the existing road and construction of a new road system.
The contract included fully equipment i.e. fences, goals, lighting system and tiling around the field.
The contract included the construction of a new highway from high way 3 in the east to“Nordre Ringvej” in the west.
The contract included the establishment of a new artificial turf facility at Rådmandshaven in Roskilde.
The contract included the establishment of a new 3rd generation artificial turf field on the stadium of Lolland Municipality.
The contract included the establishment of an area fitting 3 new grass soccer fields, located in the“Green Wedge” in Brøndby.
The contract included soil remediation and pavings for a new schoolyard and an expansion at the school at“Islands Brygge”.
The contract included soil-, drainage and sewege work in a 15 m deep sheet piled pit and backfilling of sand behind the sheet piles.
A/ S Info Overview The contract included the establishment of an area fitting 3 new grass soccer fields, located in the"Green Wedge" in Brøndby.
The contract included the reconstuction and expansion of the preserved property“Favrholm” by Hillerød to a new and modern conference center for NOVO.
The contract included the construction of 2 pcs. 3rd generation artificial turf fields. In addition, there was also embed metal sleeves for mobile field equipment.
Info Overview The contract included the reconstuction and expansion of the preserved property"Favrholm" by Hillerà ̧d to a new and modern conference center for NOVO.
This contract included the execution of sewage pipes and water supply in the allotment association by Pilegård Alle, located at Pilegård Alle, Tårnby.
The contract included the establishment of a total of 284 new parking spaces at the decommisioning of various green areas and by optimizing the space already established for.
The contract included the renewal of the water supply lines in Raageleje which totaled in approximately 2,200 m supply lines plus associated consumer supply lines and gauge wells.