Examples of using Charge process in English and their translations into German
{-}
-
Colloquial
-
Official
-
Ecclesiastic
-
Medicine
-
Financial
-
Ecclesiastic
-
Political
-
Computer
-
Programming
-
Official/political
-
Political
Starting the charge process Output 2 and 3.
The television must be switched on during the charge process.
Reverse charge process for metal products within Germany.
This screen shows the real-time status during charge process.
Reflex This charge process is not suitable for all NiMH batteries!
Gassing of lead batteries can occur during the charge process.
Charge process controlled by a Multi or Quattro inverter/charger.
At this point you can set the maximum time after which a charge process is always halted.
Flashing Flashing Charge process was stopped by 11 hours safety timer.
The transmitter must be set to„OFF“ andleft in that state for the whole period of the charge process!
Charge process starts automatically as soon as permissible temperature range is reached.
The other contacts are not needed for the charge process and should not be used.
The charge process starts immediately, once the cells have been inserted with the correct polarity.
Ambient temperature during the test phase and compensates for temperature during the charge process.
During charge process, a specific quantity of electrical energy is fed into the battery.
The high charge current and the optimised battery charge technology ensure a short,efficient charge process.
This LED goes out during the charge process and illuminates again when the battery is fully charged. .
Batteries that are not expressly stated by the manufacturer tobe suitable for the currents the charger delivers during the charge process.
When you start a charge process, the integral safety timer automatically starts running at the same time.
Another safety function of the charger can terminate the charge process if a certain capacity was“loaded” into the battery.
If the charge process is started when the device is ON, the same visual monitoring may be performed with the battery icon in the top right-hand corner.
As it doesn't makesense to keep the computer running just for the charge process, you may also use a USB hub with own mains cable.
If at any time during the charge process the battery pack(s) becomes hot to the touch,unplug the battery immediately and discontinue the charge process.
In addition to this, a safety disconnect works in the background which finishes the charge process when it has reached 125% of the set capacity.
If the device is OFF when the charge process is started, a battery image will be displayed on the screen and the charge status can be monitored with the moving bar in the battery.
Since the batteries at the already executed Outputs are full, the charger will quickly get back to the Output which was activeat the time of power interruption and resume the charge process.
If everything is correct, press the‘Start-Enter' button to initiate the charge process; if you need to correct the values again, you can interrupt the process with‘Stop.
When the settings are correct, hold the‘Start- Enter' button pressed in for three seconds; the charger then initiates the automatic cell detect process BATTERY CHECK(please refer to Chapter 11 for details of programming the CHK time),and starts the charge process.
If the charger cannot detect whether the battery isfully charged for whatever reason(e.g. with delta-U detection), the charge process is terminated automatically after a set time if the safety timer is set to ON.
The charge process of lead-acid batteries becomes particularly inefficient when the 80% state of charge has been reached, resulting in efficiencies of 50% or even less in solar systems where several days of reserve energy are required battery operating in 70% to 100% charged state.