Examples of using Evaluation panel in English and their translations into German
{-}
-
Official
-
Colloquial
-
Ecclesiastic
-
Medicine
-
Financial
-
Ecclesiastic
-
Political
-
Computer
-
Programming
-
Official/political
-
Political
The evaluation panel considers that the funding shortfall is a critical issue.
The procedures and processes of Leuphana were assessed positively by the evaluation panel.”.
INDICATORSThe evaluation panel will base its assessments on these 10 indicator areas.
Receiving the independent experts' individual assessments and chairing the evaluation panels;
The Evaluation Panel congratulates all those involved for their considerable achievements in the design and implementation of these new instruments.
It has therefore set atarget of 40% women's participation in the evaluation panels that assess research proposals under FP6.
The evaluation panel calls on the Commission not to apply the framework Financial Regulation or the Staff Regulations to potential future PPPs.
The Commission suggests in its communication that the aim should be to raise the proportion of women in advisory groups and evaluation panels to at least 40 per cent.
The evaluation panel specifically recommends the following actions which are structured according to the five principles of the TIDE Bridge phase outlined above.
In my report I therefore included a requirement for the Member States and the Commission to set a target of at least 40% women in all recruitment and evaluation panels.
Both the Court of Auditors and the Evaluation Panel have criticized these procedures for a variety of reasons.
An evaluation panel of German Cancer Aid attested the excellent patient care and oncological research performed at the Centre at Ulm University Hospital.
Through the assessment and publication of developments regarding implementation, the Evaluation Panel has contributed to a reduction in the level of non-implementation of directives by the Member States.
The evaluation panel recognises the value of a tripartite structure for JTIs in these fields, pooling resources from industry, the EU and Member States.
The involvement of business representatives and of non-nationals varies significantly in internal and external quality assurance andis generally stronger in agencies' evaluation panels than in their decision making bodies.
The evaluation panel concludes that the TIDE Bridge phase was successful as a co-ordinated action, bringing together a diverse group of organisations, workers and users throughout the European Community.
At this information event, members of the BRIDGE Steering Committee and evaluation panel will provide an overview of the funding opportunities offered under the BRIDGE programme and talk about their initial experiences with the Proof of Concept offer for young researchers.
The evaluation panel wishes to thank all those members of the Commission staff who were involved during the Bridge phase as well as during the evaluation for their strong, competent and service-minded support!
Asimilarobservation was made in the Evaluation Panel Report:‘(…) the expertsfelt that ECfunding was having a higher impactfor Design Studiescomparedto Construction projects sincetheconstruction would happen anyway andthe benefit ofthe 10% helpfromthe EU wassometimes not very clear'10.
The evaluation panel is convinced that there is a clear-cut case for inter-linking the various actions to ensure that appropriate technologies are made available to address the needs of disabled and elderly persons.
Addressing the European Commission, the evaluation panel highlights a number of lessons, such as the need for greater organisational and financial flexibility, which have been learned with the first generation of JTIs and should be taken into account when setting up potential future PPPs.
The evaluation panel will base its assessments on the following indicator areas:• Local contribution to global climate change• Local transport• Green urban area• Sustainable land use• Nature and biodiversity• Quality of local ambient air• Noise pollution• Waste production and management• Water consumption• Waste water treatment• Environmental management of the local authority.
The SNSF's evaluation panel consisted of two elected representatives, six international experts, members of the SNSF National Research Council and a representative of the Marcel Benoist Foundation.