Examples of using Draft multi-year workplan in English and their translations into Russian
{-}
-
Official
-
Colloquial
To prepare a draft multi-year workplan; and.
Draft multi-year workplan for the secretariat 2012- 2015.
Consideration of the draft multi-year workplan for.
Draft multi-year workplan for the Global Mechanism 2012- 2015.
In decision 3/COP.8, Parties requested the secretariat to prepare a draft multi-year workplan for consideration and adoption at COP 9.
Draft multi-year workplan for the Committee on Science and Technology 2012- 2015.
The budget considerations contained in this document are based on outputs andthe targets proposed in the draft multi-year workplan for the GM(2012- 2015) as contained in document ICCD/CRIC(10)/5.
Draft multi-year workplan for the Committee for the Review of the Implementation of the Convention 2012- 2015.
Concerning the performance review,the GM was requested to present its proposed draft multi-year workplan to the CRIC for review and subsequently to COP for consideration and adoption.
The draft multi-year workplan(2010- 2013) contained in this document is aimed at presenting the expected accomplishments of CST, together with related performance indicators.
In paragraph 18 of the same decision the GM was further requested to present its proposed draft multi-year workplan and two-year work programme to CRIC 7 for review and subsequently to COP 9 for consideration and adoption.
The draft multi-year workplan for the CST(2012- 2015), contained in this document, presents the expected accomplishments of the Committee, together with related performance indicators.
The costed draft two-year work programme(2010- 2011)presented in this document was prepared on the basis of the Committee on Science and Technology(CST) draft multi-year workplan(2010- 2013) ICCD/COP(9)/CST/3/Add.1.
Consideration of the draft multi-year workplan for the Global Mechanism.
The draft multi-year workplan of the Committee for the Review of the Implementation of the Convention(2012- 2015), contained in this document, presents the expected accomplishments of the Committee, together with related performance indicators and targets.
Consideration of the draft multi-year workplan for the secretariat 2010- 2013.
Consideration of the draft multi-year workplan for the Committee for the Review of the Implementation of the Convention 2010- 2013.
Consideration of the draft multi-year workplan for the Global Mechanism.
Introduction 1- 4 3 II. Draft multi-year workplan for the Committee on Science and.
The Strategy also requests that a draft multi-year workplan for the CRIC be prepared by the Executive Secretary in consultation with the Bureaux of the COP and the CRIC.
In the light of the provisions above, and the fact that the draft multi-year workplan for the CRIC can only be prepared once its terms of reference have been revised and approved, document ICCD/COP(9)/5/Add.4 contains the preliminary costed draft 2010- 2011 work programme for the CRIC.
In paragraph 17 of decision 3/COP.8, the COP requested the GM to revise its current workplan to make it consistent with The Strategy, maintaining the RBM approach,and to prepare a draft multi-year(four-year) workplan complemented by a costed two-year work programme.
Consideration of the draft multi-year(four-year) workplan for the CST ICCD/COP(9)/CST/3.
Consideration of the draft multi-year(four-year) workplan for the Committee on Science and Technology(2012- 2015);
The Working Group considered the draft proposed multi-year workplan for the activities of the Working Group for the period 2012-2015, pursuant to the request of the Conference.
First, it responds to the request in decision 3/COP.8 to prepare a draft multi-year(four-year) workplan.
ICCD/COP(9)/CST/3 Draft multi-year(four-year) workplan for the Committee on Science and Technology 2010- 2013.
Report by the Chair of the CST on consideration of the draft multi-year(four-year) workplan for the CST.
In line with the strategy, the secretariat started the preparation of its draft multi-year strategic workplan and a costed biennial work programme, following a results-based management approach, in October 2007.
The CST will have before it the draft multi-year(four-year) workplan of the CST(2010- 2013) contained in document ICCD/COP(9)/CST/3.