Examples of using Draft specifications in English and their translations into Russian
{-}
-
Official
-
Colloquial
Receipt of Parties' comments on draft specifications.
The draft specifications for the application of UNFC-2009 to renewable energy resources were presented.
Vebplaneta/ Published draft specifications for CSS 2.1.
Draft specifications for pillar emplacement and as-built survey delivered to the parties for comments.
Four to approve draft specifications for ISPMs.
Following discussion, the Ad Hoc Group of Experts will be invited to consider adopting the revised UNFC andto discuss the findings with regard to the draft specifications.
Consultations through the OCS for draft Specifications and draft ISPMs.
The revised draft Specifications were then submitted to the Expert Group for review at its seventh session 26-29 April 2016.
Redlined versions showing the changes from v2 of the draft specifications are included for ease of reference.
Draft specifications for boundary pillar emplacement and as-built survey were distributed to both parties at the end of February and their comments were received in early March.
Due to the priority to finalize the draft specifications for the application of UNFC-2009, the work was put on hold.
The following articles were published in relation to the 2012 public consultation on the draft specifications for application of UNFC-2009.
Expert Group recommended that the draft Specifications be submitted to the Committee on Sustainable Energy for endorsement.
He also thanked the Specifications Task Force, and in particular its Chair Mr. James Ross,for the significant work undertaken since May 2012 in relation to the draft specifications for application of UNFC-2009.
EGRC-5/2014/INF.1- Unofficial room document: Draft Specifications for the Application of UNFC-2009 to Renewable Energy Resources as at 18 April 2014.
In addition, national plant protection organizations(NPPOs) and regional plant protection organizations(RPPOs)are able to download from the restricted SC area on the IPPC website the draft specifications which have been presented to the SC for approval.
The draft specifications were revised in the light of the comments received and the text was subsequently reviewed and endorsed by the Expert Group on Resource Classification at its fourth session in April 2013.
Consultation: Organize consultation processes through the online comment system on draft specifications and draft standards to ensure all views are collected.
Draft specifications should be developed concurrently with the revision of the UNFC to ensure compatibility and also posted to the UNECE website for public comment as soon as possible after approval of a revised UNFC.
However, it was acknowledged that whether or not it was feasible for the procuring entity to draft specifications in a comprehensive manner was not the defining criterion for all the circumstances envisaged in article 27.
The draft specifications document and other supporting documents(including glossary of terms and bridging documents) developed by the Specifications Task Force were additionally requested to be issued for a public consultation.
On this basis, the Bureau was guided to nominate a representative to participate with the SPE ORGC in development of draft specifications for petroleum, as provided in the Memorandum of Understanding of 2006 between the UNECE and the Society of Petroleum Engineers.
Concern was expressed that the wording in paragraph 22 of the draft specifications relating to national resource reporting that estimates on a national level may differ from those at a corporate reporting level could worry users.
Attention was drawn to the two draft documents circulated to the ExpertGroup prior to the fourth session: document ECE/ENERGY/GE.3/2013/3 is the final draft Specifications for the Application of UNFC-2009 and document ECE/ENERGY/GE.3/2013/4 is the final draft report documenting the basis for establishing the specifications for the application of UNFC-2009.
The Expert Group recommended that the Task Force on UNFC andRecipient Reservoirs prepare draft specifications for the use of UNFC-2009 to classify injection projects, in particular for the storage of carbon dioxide, and submit them to the sixth session.
This interim draft specification is under development by icann and registry technical teams.
This interim draft specification is under development by icann and registry technical teams.
Need for draft specification.
If, after such review period ends, a draft Specification is substantially modified, a subsequent review period shall be conducted, under the terms of this subsection, before the revised draft Specification is approved and published as a final Specification. .
For purposes of this Section 6(a),"awareness" means actual specific knowledge by an individual Participant who actively participates in UN/CEFACT meetings of both(1)this disclosure obligation; and(2) of the potential infringement of a particular published final or draft Specification.