Examples of using Estimate documentation in English and their translations into Russian
{-}
-
Official
-
Colloquial
In addition, design and estimate documentation for 34 objects is prepared.
Estimate documentation prepared for the following types of construction works.
After the feasibility study is completed, design and estimate documentation will be developed.
The work on design and estimate documentation for the first industrial district of Azerbaijan to be started in April at the earliest.
Vadim Boichenko instructed to develop design and estimate documentation for the house this year.
For today, the draft estimate documentation of the OOO"Gorzhilremontproekt", the project cost is 5.7 million rubles.
In 2016 the positive conclusion of Gosexpertiza RSE for the project design and estimate documentation was received.
Automated system“Design and estimate documentation archive of Federal Grid Company and Construction Management and Engineering Center(AS DEDA);”.
The purpose of updating the project documentation is to obtain a positive expert opinion on the design and estimate documentation.
According to him, the design and estimate documentation for Astana- Pavlodar section will be completed in May 2014.
The poultry farm, which will consist of four production queues, has been already assigned the land,design and estimate documentation is prepared.
Complex design and development of design and estimate documentation on construction facilities of 1 st to 4 th complexity class;
The investment projects were discussed within the meeting of the points,the willingness of design and estimate documentation for bank loans.
For the development of the design estimate documentation for overhauling Gull Recreation Center KZT 5 million is allocated from the regional budget.
A special emphasis was made on 26 objects included in the program to be provided with design and estimate documentation and timely financing.
In2011, the design and estimate documentation was developed, and inthe current 2013 construction and installation works were performed at110kVswitchgear.
The Cabinet of Ukrainedid not considered and did not approved design and estimate documentation, the Ukrainian party failed to finance the project.
The draft estimate documentation of the improvement and landscaping of the park is being prepared by University of Architecture and Construction as a gift for the community.
In Kalkaman, in order to restore one of the four empty houses, the design and estimate documentation is ready, which will be submitted for examination in the near future.
Such codes are mandatory for all organisations, institutions and enterprises, legal entities andindividuals engaged in design and estimate documentation.
Application of integrated software platform for developing design and estimate documentation plays an important role in successful functioning of information system in Giprotyumenneftegaz.
For this purpose, 14.1 billion tenge is provided from the regional budget,for which 86 objects will be built and design and estimate documentation for 89 projects will be prepared.
Currently, the design and estimate documentation has been prepared for the gas pipeline to the settlements of Akshi, Kurylys and Zhanys bi, which are located along the main pipeline route," Madi Yeleusizov said.
Today at the Business Monday, Ilsur Metshin, the Mayor of Kazan, ordered to change the emphasis on quality control of the design and estimate documentation preparation for capital repairs in apartment buildings.
Design and estimate documentation development service rendered by our company is provided during construction, revamping, modernization and technical re-equipment of industrial and social facilities.
According to the Mayor's Office of the city, in the current year, 10 streets and sidewalks at 34 addresses are planned to be repaired in the district, construction of outdoor lighting lines in intradomestic territories with a length of 19.7 km,design and estimate documentation for the overhaul of 80 households was developed.
To prepare a feasibility study for design and estimate documentation for the cities of Balykchy and Toktogul for future rehabilitation works to improve energy efficiency and seismic resistance within the framework of UDP.
As part of the first phase of the project(polypropylene), a loan agreement has been signed to finance the first phase of the project, designing of infrastructure facilities has been completed, construction works on infrastructure facilities have continued, the work has begun on designing the main process units and on-site utilities,the design and estimate documentation has been developed.
Many years of practice has shown that the design and estimate documentation with respect to the modernization, expansion, and retrofitting of operational combined heat and power plants, boiler plants, and heat networks, as well as with respect to the construction of new ones can be reasonably developed only on the basis of solutions accepted in schemes.
The governor recalled that in 2011 the region had adopted the program"Development of inbound and domestic tourism in 2011-2016," in which provides a number of measures aimed at promoting regional tourism products in the international market,the development is carried out design and estimate documentation for construction of berthing facilities in the area of small sea of Lake Baikal.