Examples of using Estimates include in English and their translations into Russian
{-}
-
Official
-
Colloquial
These estimates include.
Provision is made for salaries of 133 locally recruited staff,as shown in annex VII. The estimates include a 5 per cent vacancy factor for the period.
E Estimates include emissions of SF6 only.
Paragraph 6 of the Secretary-General's statement indicates that the estimates include an amount of $2,560,600 for the transfer of 132 vehicles and surplus equipment from other missions.
B Estimates include emissions of PFCs only.
People also translate
These revised estimates include the following elements.
C Estimates include emissions of HFCs and SF6 only.
Given the above-mentioned vacancy information and the fact that the estimates include an increase in the staffing establishment for local staff from 166 to 174, the Committee is of the view that the 5 per cent vacancy factor applied for local staff may also be somewhat optimistic.
F Estimates include emissions of PFCs and SF6 only.
As such, the estimates include two component-specific estimates of emission reductions.
D Estimates include emissions of HFCs and PFCs only.
As indicated in paragraph 3.46, the estimates include proposals for the abolition of 23 posts 8 in the Field Service category and 15 at the Local level.
Estimates include vehicle maintenance, petrol, oil and lubricants and vehicle insurance.
In addition, estimates include a provision for spare parts for public information services for a total of $6,103,800.
Estimates include only long-distance telephone calls and facsimile transmission and exclude all other expenditures linked with other commercial communications costs.
In addition, the estimates include a provision in the amount of $211,500 for escorting witnesses, calculated on the basis of 49 two-week trips at $4,317 per trip.
Estimates include provision for commercial communications as follows: INMARSAT charges, charges for satellite phones, Internet services, GSM telephone services, local PTT telephone lines, local leased lines, UNLB connectivity, shared UNLB leased lines, direct lines to United Nations Headquarters, charges for the United Nations Headquarters mailbox, post and pouch, and a satellite transponder lease.
As shown in annex I. B, the estimates include 19 additional posts proposed under the regular budget 12 in the Professional category and above, 1 Field Service staff, 3 Security Officers and 3 at the Local level.
The estimates include expenditures for staff directly related to the Forum and for consultants and sub-contractors for studies in relation to Forum Workshops.
As included in phase 1 of the San Vito plan, the estimates include $160,000 for consultancy work to survey the San Vito site and buildings, the development of detailed plans and designs, and certification by a locally certified consultant in conformity with local law.
The estimates include a 40 per cent delayed recruitment factor.
The estimates include a vacancy rate of 20 per cent.
The estimates include a 5 per cent vacancy factor for the period.
These estimates include daily subsistence allowance, travel costs and course registration fees.
The estimates include a non-recurrent provision for the acquisition of the following vehicles.
These estimates include daily subsistence allowance, travel costs and course registration fees.
The estimates include an amount of $133,590,400 in non-recurrent costs A/55/935, para. 64 and section IV.G.
The estimates include provisions for 9 national General Service posts for the Regional Service Centre.
Significant estimates include a production plan, future capital expenditures and oil and gas reserves available for development and production.
The estimates include a provision of $716,520 in support of joint operations with FARDC and training activities in support of FARDC.