Examples of using Network contract in English and their translations into Russian
{-}
-
Colloquial
-
Official
Your network contract.
What to do if you don't have the distribution network contract?
A network contract can easily be terminated in our e-service.
A valid purchase and sales contract and network contract;
When signing a network contract, you have to select a price package.
We recommend that one of your first steps when moving house is to terminate your network contract.
You need a network contract so you can consume electricity on a daily basis.
If your place of consumption is in an Elektrilevi network area,you can sign a network contract in the e-service of Elektrilevi.
Signing a network contract is very easy and you can do it in our e-service.
The price for the universal service depends on whether the consumption pointhas a single or dual tariff meter according to the network contract.
After installation, we will sign a network contract with you and supply electricity.
Network Contract: to band together with other small and medium enterprises to reach the appropriate size;
We recommend you sign the electricity contract on the same day as the network contract so that both contracts come into force from the same date.
The network contract must be signed with the network operator that covers your place of consumption.
The Seller is obliged to execute the Standard Conditions if the Purchaser has a network connection operating in accordance with the law and the network contract.
A network contract has to be signed when you buy an apartment or a house and it has to be terminated when you sell your apartment or house.
Places of consumption usually already have all the necessary power connections andthe only thing left to do is to conclude a network contract, which can normally be signed together with the power contract. .
A network contract is required before you can select an electricity seller and sign an electricity contract. .
If you have become the ownerof a house or registered immovable that has no valid network contract and where the power supply has been disconnected, you will have to check whether a network contract is available.
If a network contract is not available, you should send an application to reactivate the connection doc.
The quantity of open supply electricity sold in accordance with the Standard Conditions shall stand for the electricity quantities measured ordetermined in each trading period at the measuring point of the Purchasers' place of consumption in accordance with the network contract.
Once you have a network contract, you can choose a suitable electricity seller and sign an electricity contract. .
The network connection of the Purchaser's place of consumption shall be deactivated in accordance with the procedure set forth in the network contract if the Purchaser has violated these Standard Conditions and/or the conditions of the network contract signed by the Purchaser and the network operator.
This includes a network contract with Elektrilevi, signed contract, PV-systems planning, building permits, system installation and documentation.
The sale of electricity requires that a network contract be concluded between the network operator and the Buyer for the measuring point at the Buyer's place of consumption.
In a network contract, we agree on the conditions for the electricity supply, the price package of the network service and contact details for providing information like notifications about scheduled outages.
We recommend that your first step should be to sign a network contract with the network operator that covers your place of consumption or with an authorised representative of that network operator.
If the network contract and purchase and sales contract have been terminated, a new network contract and purchase and sales contract must be concluded before the network connection is restored.
The exception to this is if you are signing a new network contract, because if you sign the electricity contract on the same day as the network contract, both contracts will come into force from the same day.
If the previous owner has applied to terminate their network contract, you should sign a new network contract within 30 days of the application of the previous owner in order not to disrupt the power supply.