Examples of using Type test in English and their translations into Russian
{-}
-
Official
-
Colloquial
The ATP Type Test Report.
Type test on the basis of directive 97/68/EC;
Date of ATP type test report.
ATP type test report number. K-value.
K-value. W/m2K according to the ATP type test report.
People also translate
ATP type test report number.
For all types of IBCs, as a design type test.
The ATP Type Test Report Manufacturer's.
For all IBCs used for liquids,as a design type test.
Take our color type test and find your optimal colors.
For all types of large packagings as a design type test.
Passed type test in the most authoritative organization in China.
After 6 years or after 100 kits a new ATP type test is to be carried out.
An ATP type test for a particular kit remains valid for 6 years or 100 kits.
Difference Between Oil-immersed test transformer And Dry Type test transformer.
Instead of submitting the V.4 for a type test, Fokker produced a revised prototype designated V.5.
The manufacturer shall supply at least all parts as used in the ATP type test.
If the type test results are satisfactory, a certificate is issued for the engine concerned type approval.
Where this requirement is not fully complied with, a new ATP type test shall be conducted.
Type test: Compliance with admissible levels will be controlled through a type test of an engine or family of engines.
For all types of flexible bulk containers, as a design type test.
The type test certificate issued to the manufacturer by the approved testing station can only remain valid, if.
A declaration by the manufacturer of compliance of the Body Kit with the ATP Type Test Report(Model No 11);
A design type test with water is not required if adequate chemical compatibility is proved with wetting solution or nitric acid.
The manufacturer must complete the Declaration of Compliance of the Body Kit with the ATP Type Test Report.
Under this proposal the manufacturer of the kit,as holder of the Type Test Certificate, is responsible for the finished product.
For all types of large packagingswhich are designed to be stacked on each other, as a design type test.
The installation aboard inland navigation vessels of engines which have undergone a type test might therefore be required as from 1 January 2002.
You will have to answer as quickly as possible to the questions that make you to get the highest score andyou must choose between three possible answer type test.
Other materials for pulse lines are only permitted after a type test together with the burner.