Examples of using Should be installed in English and their translations into Serbian
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
-
Latin
-
Cyrillic
Should be installed by the end of the week.
Smoke detectors should be installed in each bedroom.
To increase the adjustment force, an additional lever should be installed(75 cm long).
Sheets should be installed in a staggered manner.
Hit“Update File,” andGoogle Analytics should be installed on your WordPress site.
This design should be installed on the edge of the table and strike at an angle.
On the front side, two contact holders and several current regulators should be installed.
Smoke detector should be installed in every bedroom.
And the capacity from which irrigation water intake will be made should be installed at a certain elevation.
The battery pack should be installed in a dedicated room.
When the building has more than 6 floors, a differential pressure control,providing 10 kPa, should be installed on each floor.
Besides, all devices should be installed on the machine body.
The interior must be supplemented with elements with complex shapes;instead of interroom partitions, arched structures should be installed.
Sleeping Rooms: Smoke detectors should be installed in every sleeping room.
Sheets should be installed in a staggered manner, secured the perimeter and in the center.
As soon as you have actually done this then your subwoofer should be installed into the auto electrics.
Large cabinets should be installed 3 concealed hinges, some only 2 not;
A vacuum pump for pumping air acts on the vacuum,so the valve or valve should be installed in the opposite direction.
(1) the first mixer should be installed on a qualified concrete foundation.
If as the child grows up,there is no confidence in the quality of water from the tap, then a stationary filter of deep cleaning should be installed.
The end mill should be installed so that the tooth is placed exactly horizontally.
When connecting the hood remember the switch should be installed per phase and not to zero.
All autoclaves should be installed and handled to avoid contamination of their exteriors.
Between seedlings there should be a distance of 40-50cm. A metal or wooden crossbar should be installed near each well, to which the plants will become attached as they grow.
The sensor should be installed near the radiator, which in the course of its operation heats up more than the others.
For a gabled roof,sheets on each side should be installed at the same time with the ridge tile.
The workbench should be installed in a well-lit place(near the window), but at the same time it is necessary to install lamps for lighting in the evening.
On the surface of the table should be installed line under the shape that you want to cut.
The width of the door should be installed approximately 2-2.5 cm less than the same parameter of the support member.
Transistors and output diodes should be installed on radiators without using additional pads.