Examples of using Total work in English and their translations into Spanish
{-}
-
Official
-
Colloquial
Total work.
Scripting for total work personalisation.
Total work thousands.
It becomes the grammar for the total work.
Total Work Done Amps* Seconds.
People also translate
Extension assimilated to 10% of the total work(3).
Total work in kilojoules from power data.
The group doing more total work are rural women.
The total work consists of 50 photographs and interviews.
Less formal work, but more total work.
What is the total work input required to move the hoist?
This is therefore something other than total work volume!
Total work time| Gender Equality Observatory.
And therefore the total work done in this time interval is.
One time position fixing will be OK for total work.
The total work done is independent of the inertial frame of reference.
Most Capstone Projects require about 40 hours of total work time.
The total work W done by the forces acting on a particle is given by.
The release burndown chart shows how much work has been completed, and the total work remaining.
The total work is just the sum of the work done at each level.
The figure employed as clerks and related clerical fields was 48.3 per cent of the total work force of that sector.
Total work includes both paid and non-paid work. .
Type the information in the Total work, Actual work, Mileage, and Billing information text boxes.
A burndown chart shows the amount of work that has been completed in an epic or sprint, and the total work remaining.
Enter your total work income before taxes and other deductions.
Please tell me about your installation at Inhotim in Belo Horizonte, Brazil, where all of the arts come together as a total work.
Ensure that the total work area can be viewed from the operating position.
People aged 25- 54 spend the greatest time on total work when they are both raising children and participating in paid work. .
The concept of total work combines the time spent on paid work with the time spent on unpaid work, thus providing a measure of total productive time.
The BurndownCharts show, graphically,the amount of total work(other efforts) over time, reflecting your correlation with the progress of the project teams in reducing your work. .