Примеры использования A passenger terminal на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
Construction of a passenger terminal is envisaged.
We, as consumers,can see that, for us, there is a passenger terminal.
One built a passenger terminal having an area of 17,000 sq.
In 1964 the runway was expanded to 1500 m, and a passenger terminal was built.
Reconstruction of a passenger terminal at an airport in Petropavlovskwill start next week.
Newsroom News Construction works are commenced at“Riga” International Airport to expand a passenger terminal.
Place a lot of bathroom stalls in a passenger terminal, then save the game.
Newsroom For press Press releases 2014 Construction works are commenced at“Riga” International Airport to expand a passenger terminal.
By that time the construction of a passenger terminal with a possibility of the capacity of 2 million people annually will be completed.
Construction works are commenced at“Riga” International Airport to expand a passenger terminal| Riga International Airport.
Darwin operates a passenger terminal for domestic and international shipments with numerous shopping zones, restaurants and cafes, as well as a terminal for freight.
Unauthorized smoking, misuse of electronic devices, failure to leave a passenger terminal and aircraft, etc.
The airport has a passenger terminal, located on the A233 road just south of Leaves Green, which provides facilities for such flights, including departure lounges, a licensed café bar, and customs and immigration facilities.
In addition, in January 2015, in the framework of the state program"Nurly Zhol",one has started building a passenger terminal at the airport in Astana.
It had a dirt runway of 2,700 metres(8,900 ft) and a passenger terminal in a makeshift, cob-wall shack covered with buriti-leaves.
Provision is made for the cost of materials to upgrade airport runways, airstrips andfor the maintenance of airfields as well as for the construction of a passenger terminal $3,100,000.
Director of the transport aviation hub Yuri Kim informed K. Massimov on the reconstruction progress of a runway and a passenger terminal, familiarized with the security system.
A passenger terminal representing a huge five-storey building having an area of 180 thousand square meters, the outlines of which resembles a falcon sprawled in flight will become the most important part of the airfield complex.
Construction works have been started regarding a project“Expansion of a passenger terminal of SJSC“Riga International Airport” 5th level- Northern terminal, 1st level of building”.
In this phase, a passenger terminal with a floor space of 496,000 square metres(5,340,000 sq ft), two parallel runways, a control tower, an administrative building, a transportation centre(the Integrated Transportation Centre, designed by Terry Farrell and Partners and Samoo Architects& Engineers), and integrated operations centre, three cargo terminals, international business centre, and a government office building were constructed.
The airport facilities include an ICAO category I airfield with a runway of 2,704 m х 46 m,hangars for aviation machinery, and a passenger terminal, including international flights area.
However, international studies indicate that a passenger terminal handling about 1 million passengers per year will generate road traffic of approximately 3,000 veh/day(AADT) and this is consistent with observed traffic at ZIA.
The first phase of the airport, featuring one A380 capable runway, 64 remote stands,one cargo terminal with annual capacity for 250,000 tonnes of cargo and a passenger terminal building designed to accommodate five million passengers per year, has been opened.
The station building includes a passenger terminal(600 passengers), 4 railroad tracks and 3 platforms, a bus terminal served by commuter and intercity buses(each seats 75 people) and equipped with underground access to the passenger platforms.
The structure of the airport comes in-a new security system, a mother and child, a passenger terminal with a developed infrastructure for passengers with disabilities have a separate room.
Reconstruction and development of Sofia Airport: The first stage of the reconstruction and modernization foresees the expansion of the existing runway,construction of a new parallel runway, construction of a passenger terminal, adjacent aprons and all other airport infrastructure supporting facilities.
The latter consists of four hangars: one is used by Helog AG to maintain its helicopters;a second is used as a passenger terminal and service facility for United Nations flights; a third houses Ivorian military aircraft and munitions; and the fourth contains the fixed-wing aircraft belonging to the Ivorian presidential fleet see figure XVIII.
The Altcom Road Construction Company LLC, Ukraine, has started the construction of prioritized objects, namely a passenger terminal with its carrying capacity of 500 passengers per hour, the runway, the tower and the air traffic control center.
There is one of the four sea ports of Crimea- Yalta Marine Commercial Port,which includes a passenger terminal, cargo complex, port stations and 25 berths: 4- passenger, 17- local passenger lines 1- cargo and 3- subsiduary.