Примеры использования Ad hoc groups of experts на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
Item 6: Reports of existing ad hoc Groups of Experts.
Ad Hoc Groups of Experts on Natural Gas Resources- new projects;
The Committee approved the establishment of the two ad hoc groups of experts.
Ad Hoc Groups of Experts on the Supply and Use of Gas- review of activities.
Working Party on Gas,related Ad Hoc Groups of Experts and Gas Centre.
Ad Hoc Groups of Experts on Natural Gas Resources and on the Supply and Use of Gas;
Specific sets of recommendations in accordance with this outline will be prepared by ad hoc groups of experts.
Vi that the two ad hoc groups of experts, on steel and on the chemical industry, should continue their mandates.
The Committee is invited to consider andadopt the programmes of work for these two ad hoc Groups of Experts.
In addition, there are two Ad hoc Groups of Experts(one on steel and one on the chemical industry) that report to the Committee.
After discussion the Extended Bureau of the Committee on Sustainable Energy and its Working Party, Ad Hoc Groups of Experts and Projects.
Ad hoc groups of experts are normally limited to mandates of a maximum of two years, but these can be renewed if warranted.
These materials result from the work of different working parties, ad hoc Groups of Experts, expert meetings etc.
The work of page 16 the newly established ad hoc groups of experts set up by the Committee will contribute to studies of cross-sectoral issues.
The secretariat presented the recent developments of the Working Party on Gas, its Ad Hoc Groups of Experts and the Gas Centre.
Creates projects and establishes,when necessary, ad hoc groups of experts to address specific problems and concerns identified by the Working Party.
TRADE/WP.6/2003/16/Add.2 Addendum to Report of 13th session of WP.6- Terms of Reference of the WP.6 and its Ad Hoc Groups of Experts.
The review/assessment review should define which ad hoc groups of experts and, if necessary, which working parties will be phased out.
The review mechanism is coordinated by the secretariat,supported in some instances by either informal inter-agency task forces or ad hoc groups of experts.
The Committee approved the establishment of ad hoc groups of experts on the chemical industry and on steel and adopted the two programmes of work.
The programme of work was reviewed by the Extended Bureau of the Committee on Sustainable Energy and its Ad Hoc Groups of Experts on 9 December 2004 ENERGY/2004/6.
An amount of $70,100 is requested to convene two ad hoc groups of experts in relation to the role of women in the development of the least developed countries; and fiscal reform in the mobilization of domestic resources.
Therefore, it is essential for UN/ECE work to build on its existing expertise andestablished networks, including the ad hoc Groups of Experts on Steel and the Chemical Industry.
In the basic industry strand, the two newly created ad hoc groups of experts on the chemical industry and on steel adjusted their ongoing activities to be in line with lower resource allocations and the directions provided for in the Plan of Action.
The secretariat will deliver a brief summary of the types of intergovernmental bodies that exist within the UN system, including Ad Hoc Groups of Experts and Working Parties.
The Working Party was informed that the Executive Committee of UNECE had established two new ad hoc Groups of Experts on Euro-Asian Transport Links(ECE/EX/2008/L.5) and on Hinterland Connections of Seaports ECE/EX/2008/L.6.
She added that several new ideas were being generated by the synergy of the two sectoral groups within the Enterprise Development Section which could be applied to the work of both the new ad hoc Groups of Experts.
The committees referred to in the present section were originally established as groups of experts or ad hoc groups of experts and were subsequently renamed as committees of experts. .
The Group would function as an ad hoc Groups of Experts under WP.5 according to the UNECE Rules and Procedures and the terms of reference contained in the Annex of the report of the twenty-third session of WP.5 ECE/TRANS/WP.5/48.
A third legislative review was completed by the Extended Bureau of the Committee on Sustainable Energy and its Ad Hoc Groups of Experts on 14 December 2005(ENERGY/2005/6) when it approved the Strategic Framework for 2008-2009.