Примеры использования Draft monitoring strategy на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
CCC will present the draft monitoring strategy.
The draft monitoring strategy provided a platform for the Parties to begin their discussions on current and future monitoring activities.
ECE/EB. AIR/GE.1/2009/15 Draft monitoring strategy.
Ms. Aas outlined the current deficiencies in EMEP monitoring in relation to the requirements andassociated costs to implement of the draft monitoring strategy.
CCC will present the revised draft monitoring strategy.
It was suggested that the final draft monitoring strategy should be prepared by CCC and submitted to the Steering Body at its next session for approval.
EMEP/CCC Technical Report,the background paper to the draft monitoring strategy.
Mr. K. TORSETH(CCC) presented the draft monitoring strategy EB. AIR/GE.1/2003/3/Add.1.
The draft directive called for background monitoring, irrespective of concentration levels,with a spatial resolution similar to what was recommended for level 2 in the EMEP draft monitoring strategy.
Mr. Torseth presented the revised draft monitoring strategy EB. AIR/GE.1/2004/5.
It welcomed the new draft monitoring strategy of EMEP for PM and reiterated the potential usefulness of detailed PM data(including composition) for health studies.
Requested the Task Force to consider the issues above,propose revisions to the draft monitoring strategy accordingly, and report back to it at its twenty-eighth session;
In developing the new draft monitoring strategy, due consideration was given to the current strengths and weaknesses of the programme as well as the opportunities for its development and the threats to its future.
He stressed the importance of the measurements provided by Parties for the work of EMEP;he requested all Parties to consider carefully the draft monitoring strategy and provide their comments to the Task Force.
Mr. Torseth introduced the draft monitoring strategy for the 2004-2009 period.
It requested the Task Force on Measurements and Modelling to consider the issues raised during the twenty-seventh session,propose revisions to the draft monitoring strategy accordingly and report back at the twenty-eighth session of the Steering Body.
It also urged Parties to consider the draft monitoring strategy in detail and provide input and comments ato the next meeting of the Task Force.
The Task Force on Measurements andModelling, supported by CCC, will assist Parties to implement the draft monitoring strategy and carry out further work for the possible adoption of a monitoring strategy next year.
Expressed its appreciation to CCC for preparing the draft monitoring strategy and welcomed its offer, in collaboration with the Task Force, to provide guidance to national experts and to assist them in the implementation of the monitoring strategy, including through organizing a workshop on the implementation of the strategy in 2010;
It is expected to adopt the revised draft monitoring strategy and may wish to discuss measures to ensure its implementation.
This document presents the draft monitoring strategy for the Cooperative Programme for Monitoring and Evaluation of the Long-range Transmission of Air Pollutants in Europe(EMEP) for 2010- 2019 as revised by the Chemical Coordinating Centre(CCC) in consultation with the Bureau of the EMEP Steering Body and as mandated by the Steering Body at its thirty-second session in 2008(ECE/EB. AIR/GE.1/2008/2, para. 33(f)).
Welcomed progress in the development of the new draft monitoring strategy for EMEP and encouraged the Steering Body to finalize this work in 2004;
Urged Parties to consider the draft monitoring strategy in detail and provide input and comments to the Task Force at its next meeting;
Jl Welcome progress in the development of the new draft monitoring strategy for EMEP and encourage the Steering Body to finalize this work in 2004;
Mr. Schneider drew attention to the draft monitoring strategy and appealed to Parties to consider carefully the requirements that it contained and to assess its feasibility.
Expressed its appreciation to CCC for preparing the draft monitoring strategy and welcomed its plans to organize a workshop on the implementation of the strategy on 22-24 November 2004;
Mr. Derwent provided an overview of the Task Force discussions concerning the draft monitoring strategy, progress in the preparation of the assessment report, review of the unified EMEP Eulerian model, recent heavy metals and POPs model developments, and the approval of monitoring data reports.
Draft revised monitoring strategy.
CCC will present the draft revised monitoring strategy;
Draft EMEP monitoring strategy and measurement programme 2004-2009.