Примеры использования Shunting на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
Shunting tracks.
Bad organization of shunting activities.
Shunting/marshalling yard.
Modernization of shunting locomotive series TGM-4.
Shunting locomotive series TEM ITH.
Люди также переводят
The Terminal has got 3 own shunting locomotives.
Shunting and other similar movements are excluded.
Spare parts for shunting locomotives and wagons.
Shunting locomotive when moving a local train.
I'm going to try shunting it through the warp drive.
The Group operates 5 main line diesel locomotives and 9 shunting locomotives.
Railway: shunting locomotives.
The company has already produced over 50 new shunting locomotives TEM TMH.
We provide shunting, loading and unloading services.
Game Description Railroad Shunting Puzzle 2 online.
The shunting labels as described in 5.3.4 RID only.
Transport locomotives with 3 or 4 axes: Camera-monitored shunting.
For the repair of shunting locomotives TEM2, CME3, TGK2, TGM4.
The company has its own operational park of main-line and shunting diesel locomotives.
Many shunting systems are too clumsy or involve high wear.
Emissions of harmful substances andsmoke content of exhaust gases from main-line and shunting locomotives”.
Odessa, Ilyichevsk- Odessa(shunting station)- Znamenka- Dnepropetrovsk cargo(Ukraine)"Dneprovets.
Prospects of the hybrid electrical transmission application on the shunting diesel locomotives(in Russian)// Ibid.
Having the own shunting locomotives allows the company provide the supply of cars and route.
Harmonization of design andconstruction of redundant(shunting) power transmission lines and substations.
Own two shunting locomotives are used for cargo operations, with a right of entrance to station tracks.
Transgarant and its subsidiaries own, apart from the freight rolling stock,five main line diesel locomotives and two shunting locomotives.
Owing to the availability of shunting diesel locomotives, the said enterprises perform works related to preparation of routes.
This usually requires the train to move up to the central unloading station andthen with the extremely precise shunting of the entire train to the docking station.
The current transformers have the shunting which are intended to limit the voltage of the secondary winding.