Примеры использования Two-year work programmes на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
The multi-year work plans are accompanied by two-year work programmes 2008- 2009.
At COP 9, two-year work programmes will cover years 2010- 2011, at COP 10 2012- 2013 and so on.
Under The Strategy,CST multi-year(four-year) workplans and costed two-year work programmes are prepared.
Having reviewed the costed draft two-year work programmes for the Committee on Science and Technology and the secretariat contained in document ICCD/COP(10)/8.
Second review of performance taking an RBM approach andbased on the reports on the two-year work programmes(2012- 2013) of the CRIC and the CST.
The costed draft two-year work programmes for the secretariat, the Committee for the Review of the Implementation of the Convention and the Committee on Science and Technology 2012- 2013.
Consequently, both institutions integrated this assistance into their two-year work programmes and multi-year workplans approved by the COP.
They are requested to operationalize their contribution to The Strategy by preparing results-oriented multi-year workplans and costed two-year work programmes.
The multi-year work plans will be accompanied by costed two-year work programmes, which coincide with the budgetary cycle.
Parties commend the efforts made by the two institutions to develop the joint work programme(JWP),while noting some overlaps with their respective two-year work programmes.
The structure of the 2008- 2009 JWP is consistent with the respective institutions' two-year work programmes and with the United Nations RBM framework.
The Convention institutions and subsidiary bodies mentioned in paragraph 2 above were each requested to operationalize their contribution to The Strategy by preparing results-oriented multi-year(four-year)work plans and costed two-year work programmes.
Second review of performance taking an RBM approach andbased on the reports on the two-year work programmes(2012- 2013) submitted by the secretariat and the GM.
The multi-year work plans and two-year work programmes of the subsidiary bodies and Convention institutions are constructed around the five operational objectives and the respective outcome areas under each objective, as defined in The Strategy, in accordance with their mandates.
In other words, the 2010- 2011 Convention budget proposal is built on the resource needs relating to the two-year work programmes of CRIC, CST, GM and the secretariat.
It also discussed in detail the four-year workplans and two-year work programmes of the CRIC, the CST, the UNCCD secretariat and the Global Mechanism(GM), as well as the joint work programme of the GM and the secretatriat.
Concrete steps to be taken in the near future towards achieving the workplans are presented in the two-year work programmes of the Convention bodies and institutions.
Third review of performance taking an RBM approach andbased on the reports on the two-year work programmes(2014- 2015) submitted by the secretariat and the GM, and taking into consideration the outcome of the mid-term evaluation of The Strategy.
As at October 2010, the GM and the secretariat have initiated the preparation andupdating of their 2012- 2015 workplans and the corresponding costed two-year work programmes, for submission to COP 10.
In accordance with decision 3/COP.8, the multi-year work plans and two-year work programmes are prepared following a results-based management(RBM) approach.
In the following biennium(2010- 2011), joint activities of the secretariat andthe GM under the joint work programme will be integral parts of their respective two-year work programmes and related budgets.
The COP also requested the GM and the secretariat to prepare costed two-year work programmes, building on the four-year workplans, and a draft joint work programme. .
The Executive Secretary should, if so requested by the regions, provide one post per region within the available resourcesof the core budget, as reflected in costed two-year work programmes, in order to support the RCMs.
The COP provided more specific guidance by including a template for the two-year work programmes in annex III to decision 9/COP.9, with a focus on the resource requirements for each subprogramme of the work programme. .
It is proposed that this be done as part of the reporting of both institutions to the CRIC and the COP sessions, as requested by decision 3/COP.8,in which they will also discuss the four-year work plans and two-year work programmes of both these institutions.
In line with decision 3/COP.8 which requires the subsidiary bodies andConvention institutions to provide costed two-year work programmes, general costing estimates for carrying out the work programmes are presented in these documents.
It is proposed that this be done as part of the reporting of both institutions to the sessions of the CRIC and the COP, as requested by decision 3/COP.8,at which they will also discuss the four-year work plans and two-year work programmes of these institutions.
With regard to preparation of the JWP,it was decided that both entities would first prepare their multi-year work plans and two-year work programmes and carry out the related institutional reshaping required for meeting the requirements of The Strategy.
In addition to the mandate given to the secretariat and the GM in the Convention text, The Strategy provides more detailed guidance on tasks and roles of the two institutions,which shall be reflected in the two-year work programmes and the four-year workplans of the same.
The budget proposal for 2010- 2011 consists of this document andits four addenda that contain the draft costed two-year work programmes of the Committee on Science and Technology(CST), the Committee for the Review of the Implementation of the Convention(CRIC), the Global Mechanism(GM) and the secretariat of the United Nations Convention to Combat Desertification UNCCD.