Приклади вживання Additional capacity Англійська мовою та їх переклад на Українською
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
Additional capacity will have to buy.
Otherwise, you need to invest in additional capacity, as well as the high base with one hand.
Additional capacity from the main bowl vary in size and depth.
Soft kitchen corners are endowed with another functional feature- additional capacity in them.
This additional capacity for storage of flowers and bouquets.
These new plants are also benefiting producers, as the additional capacity reduces transport distances.”.
Ku-band and an additional capacity of up to 3 transponders in Ka-band.
For example, they will be able to sell part of the battery charge of their electric vehicles back to the electric company,if the latter needs additional capacity.
Up to 100 gigabytes of additional capacity can be obtained at an additional cost.
Additional capacity will provide the satellites Thor 5 and Thor 7(1°'west longitude), jointly owned by Telenor Satellite and Intelsat.
If it goes over, the city has to buy additional capacity on the open market at an increased rate.
Planned additional capacity- 6.8 mln tons, of which 2.99 mln tons(44% of the planned total) is estimated for 2022.
One of the largest Ukrainian media companies1+1 Media Group began to use additional capacity on the satellite Astra 4A(4,8°E) for its free TV channels.
After the war had to build additional capacity for receiving and storing grain, because grain production in the region has increased significantly.
It operates worldwide charter flights,provides wet lease services to major airlines seeking additional capacity and is also an important provider of air transportation for UN peacekeeping forces.
Any additional capacity that was gained through road expansion is lost to more traffic due to induced demand(a. k. a.“rebound effect”) after 3-4 years.
If there is a high probability that the system will require additional capacity during its lifetime, it is also sensible to allocate space for additional batteries in the system design.
Additional capacity will enable connection of new consumers and enhance the reliability of power supply to existing and would-be substations powering the Dnipro metro system.
Ten heavy duty beams satellite will increase the existing coverage of SES in the region andwill provide additional capacity, necessary for the needs of the DTH platforms, corporate and mobile communications services in Mexico, the countries of Central and South America and the Caribbean.
It will create additional capacity for connection of new consumers and improve reliability of power supply to the current and planned substations powering an underground railway system.
A steady business, which requires little capital investment,has additional capacity to increase traffic and significant potential for increasing operational efficiency as well as the development of additional services.
The substation will provide an additional capacity for connecting new consumers and improve reliability of power supply to the current and planned substations powering the underground railway system.
Under the new agreement Telekom Srbija leases additional capacity on SES ASTRA satellite to transmit three additional channels RTS- RTS1, RTS2 and children's channel RTS Poletarac, as well as three radio stations.
The substation will provide an additional capacity for connecting new consumers and improve reliability of power supply to the existing and planned substations powering the city's underground, and will allow to dismantle the obsolete system of overhead power lines.
A new 150/10/6kV substation"Naddnepryanskaya" is now designed, its additional capacity will facilitate connecting new consumers and would-be built substations, as well as enhancing the reliability of power supply to existing substations providing electricity to the local Dnipro's Underground.
The new 150/10/6kV"Naddniprianska"substation is now being designed; its additional capacity will facilitate connecting new consumers and would-be substations, as well as enhancing the reliability of power supply to existing substations providing electricity to the local Dnipro's Underground.
Later, technological and thermal schemes were improved, additional capacities were introduced.
The substation will provide additional capacities for connecting of new consumers and improve reliability of power supply to the existing and planned substations powering the subway.
This is why we are planning to engage consultants very soon to find answers to such questions as what thereserves of the existing generation system are, and which additional capacities will be required taking into account the changes in the structure of generation capacities expected in the near future.