Приклади вживання Earthworks Англійська мовою та їх переклад на Українською
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
Flea bites earthworks.
Earthworks of any complexity;
I would definitely recommend Earthworks.
Earthworks and general construction works.
Work tents for earthworks by network operators.
Earthworks, pits and ponds excavation4.
Today, its preserved remains, earthworks fortifications.
Earthworks and the foundation of the greenhouse.
Gorgolevsky supervised all earthworks and construction works.
Earthworks is performed at the initial stage of the construction process.
One of the most important,costly and complex components are earthworks.
At this stage earthworks and demolition works have been finished.
Today's Remains interior of the castle- it earthworks to 3-4 m height.
For earthworks needed a shovel or drill, for fixing parts- screwdriver.
Possible air and dust(soil) route of infection during construction and earthworks.
Earthworks on the development of foundation pits to a depth of 6,0m in any soils.
Contrary to the talk of non-professionals, earthworks done after the development of the pit yet have continued.
Earthworks were carried out simultaneously all over the whole perimeter of the terminal.
Geological knowledge will give you the opportunity to choose technical devices and equipment,which will be earthworks.
Earthworks in the form of rectangular 12-star, located on the dominant height(watershed).
For example, it is necessary to perform a breakdown of all the main axes of the structure,to calculate and to control earthworks.
Problems of erosion, earthworks, alterations in the course of the river or stream and changes in soils, flora and fauna are some of the consequences.
A geotechnical engineer then determines anddesigns the type of foundations, earthworks, and/or pavement sub-grades required for the intended man-made structures to be built.
Calculation of earthworks by the method of cross-sections is a very simple procedure, but very responsible and relevant to the construction.
Collectively, these data put into the project andgives the opportunity to calculate the cost earthworks, their volume and the number of necessary machinery involved in this process.
The earthworks and structures of the construction railway was completed on 30 June 1907 and on 19 August the first steam locomotive ran to the portal of the tunnel.
In order to correctly select the required method execution earthworks, as well as the appropriate tools, you must first perform the calculation of volumes of these works.
In Almost any construction process- regardless of what is being built is a residential home orindustrial enterprise is necessarily executed calculation of earthworks.
The calculation of the volume of earthworks in order to calculate the cost of the construction phase, and also in order to optimize the process;
Construction earthworks- digging under a foundation, swimming pool or pond, a trench for an autonomous country house sewer, drainage system or water cottage.