Esimerkkejä Be planned käytöstä Englanti ja niiden käännökset Suomi
{-}
-
Colloquial
-
Official
-
Medicine
-
Financial
-
Ecclesiastic
-
Official/political
-
Computer
-
Programming
It must be planned well.
Which materials can be planned?
It must be planned well.
Why must everything be planned?
Plantations must be planned carefully while preparing for additional watering.
Ihmiset myös kääntävät
Love can't be planned.
A specific communication in these terms should therefore be planned.
Therefore, as a priority, it must be planned reclamation suburban area.
We were working on a job. It had to be planned.
Automate be planned deliveries to decrease the costs of manual interventions.
And predictability can be planned for.
Physical activity must be planned in advance and adjusted according to your well-being.
Do you understand me? Life cannot be planned.
Leisure time must be planned in such a way that it includes active and intellectual rest.
Therefore, the holiday must be planned in advance.
An intermediate step increase of the national tax rates should then be planned.
More than one underground floors can be planned for the hotel garage.
Small projects can be planned and implemented efficiently by the institutions and organisations on the ground.
All free-machining materials can be planned.
Do not forget, the construction should be planned with a reference to the comfort of being in it.
If everything is well otherwise,the C-section can be planned beforehand.
Special procedures must be planned given the relationship between the defence industry and the public sector.
Prevention of pressure problems can be planned proffesmotry.
Cost can be planned because there are no additional expenditures for migration, administration, or maintenance.
An expected system restart orshutdown can be planned or unplanned.
All new nuclear power plants should be planned to stand a crash of a big passenger aeroplane without radioactive emissions outside the power plant.
A specific challenge concerns services which cannot be planned long in advance.
The necessary inspections should be planned, carried out and their results should be reported.
Thus, maintenance and repair operations ornew investments can be planned in due time.
Killing of animals and related operations shall be planned in advance and carried out in accordance with standard operating procedures.