Exemplos de uso de Existing ships em Inglês e suas traduções para o Português
{-}
-
Colloquial
-
Official
-
Medicine
-
Financial
-
Ecclesiastic
-
Ecclesiastic
-
Computer
-
Official/political
Easy and comfortable upgrade for existing ships.
Integration in existing ships with neutral installation requirements.
Among which, we call attention to those relating to existing ships.
Revamping of existing ships in view of improving their operational costs may be seen as a sustainable approach.
The Garmin Quatix can even be integrated into existing ships on board networks.
The system can deliver an integrated part of most automation systems(typically on new ships) oras a stand-alone installation typically on existing ships.
For example, the double bottoms of many existing ships, including the RMS Olympic, were extended up the sides of their hulls, their waterlines, to give them double hulls.
Gigantic yards employing more than 10, 000 workers cut and extend the existing ships.
The corresponding SOLAS requirement allows for modifications of existing ships to take place at the time of major repairs, alterations or replacement of life-saving equipment.
Clearly, in order to satisfy the requirements of this law,there will have to be major structural modifications to existing ships in many cases.
The reason we are asking to have them built, andwe are also going to ask you to have the existing ships modified to our specifications is that we have been hit by pirates every single time, and our losses are great.
The principal work of the Society's expert technical staff is to undertake surveys to ensure that the ruleswhich it has developed, are applied to both newly built and existing ships in order to ensure the safety of these vessels.
For existing ships, the verification of the requirement to have a SEEMP on board according to regulation 22 shall take place at the first intermediate or renewal survey identified in paragraph 1 of this regulation, whichever is the first, on or after 1 January 2013.
To meet that concern, therefore, as I mentioned earlier,the Commission is first proposing that existing ships of less than 24 metres in length be excluded from the scope of the proposal.
However, as far as sewage as referred to in Article 2(c) is concerned, the implementation of this Directive shall be suspended until 12 months after the entry into force of Annex IV to Marpol 73/78,while respecting the distinction made in this convention between new and existing ships.
The proposed rules are designed to support a staged approach towards setting global energy efficiency standards for existing ships, as proposed by the United States and supported by other members of the International Maritime Organization.
At the time of renewal, extension or revision of the certificates, the Member State of the receiving register, or the recognised organisation acting on its behalf,shall not impose requirements other than those initially prescribed for the full-term certificates insofar as requirements for existing ships and conditions remain unchanged.
When the Commission tabled this proposal, we took due account of the technical difficulties that could arise from fitting these instruments on board existing ships and craft and we therefore made the provision that the committee could agree on exemptions from some of the technical requirements that VDRs have to comply with.
In view of the structural modifications that the existing ro-ro passenger ships may need to undergo in order to comply with the specific stability requirements, those requirements should be introduced over a period of years in order to allow to the part of the industry affected sufficient time to comply:to that end, a phasing-in timetable for existing ships should be provided.
Council Directive 98/18/EC of 17March 1998 on safety rules and standards for passenger ships applies to new and existing ships on domestic service according to the requirements of Annex I.
In its communication"a common policy on safe seas", the Commission underlined the request of the extraordinary Council on Environment and Transport of 25 January 1993 to support the action inthe International Maritime Organisation(IMO) on the reduction of the safety gap between new and existing ships by upgrading and/or phasing out existing ships.
Besides this, the project also aims to develop the individual components of the autonomous ship in a way that they can be retrofitted to existing ships thus improving their technical or navigational performance in short term.
At the same time the Commission takes the view that when the safety of passengers and crew on board vessels is concerned, every attempt should be made to secure the highest possiblelevel of safety and to ensure that this level applies to the largest number of new and existing ships so that competition cannot be distorted by differing levels of safety.
An initial survey, before the ship is put into service on domestic voyages in a host State, or within 12 months after the implementation date of this Directive as established in Article 14(1), for existing ships engaged on domestic voyages in the Member State the flag of which they are entitled to fly;
Whereas the various classes of both new and existing passenger ships require a different approach for establishing safety requirements guaranteeing an equivalent safety level in view of the specific needs and limitations of these various classes;whereas it is appropriate to make distinctions in the safety requirements to be respected between new and existing ships since imposing the rules for new ships on existing ships would imply such extensive structural changes as to make them economically unviable;
Outfit an existing ship with the latest in computer controls.
Existing ship' shall mean a ship which is not a new ship; .
Installing the T40MC in existing ship engines is especially easy owing to its neutral installation space requirements.
The VEEO MK4 Interfaces with existing ship systems and instruments involved in energy use and transmission showing the performance of both vessel and auxiliary machinery.
Props and models===Paramount made a decision early on to use existing ship models for filming, meaning the old models-some more than a decade old-had to be refurbished, adapted, and reused.