Examples of using Construction time in English and their translations into Bengali
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
Reduced Construction Time:.
Prefabricated Factory Building is reduced construction time.
Shorten construction time:.
Reinforcing Mesh reinforcement considerably reduces construction time.
Easy construction, time- and labor saving.
There were thus only eight months of construction time available.
Can reduce construction time by up to 40%.
Cost-effective: Fast and easy installation greatly shorten the construction time which reduce the costs;
Fast construction, time saving and labor saving.
Cost-effective: Fast and easy installation greatly shorten the construction time which reduce the costs;
It can save a lot of construction time compared to traditional floor decking system.
Poison-free and odor-free, no pollution, easy construction, short in construction time.
This reduced construction time by up to 40%.
The cold room size can be customized freely,it is easy destuffing and movement, the construction time is very short.
Simple to build with, construction time is cut in half.
This does great good for make, transportation, installation, etc., and saving a lot of construction time and material cost.
It can save a lot of construction time compared to traditional floor decking system.
Short construction time, light deadweight, high strength, small cross section, wide application, well anti-seismic performance and beautiful appearance.
Short repair time: no need to remove the tiles, the construction time is only 1/3 of the traditional.
Short construction period: since all components are manufactured in factory, we justdo a simple installation in site, which has greatly lessened the construction time.
Reasonable cost: with a light self weight and short construction time, steel factory building has much lower cost than concrete ones.
The operators could install fiber splitters and pigtails in advance, so itjust needs to connect the cable in the field, which will shorten the construction time and improve work efficiency.
Using such models can significantly reduce construction time at home, which is one of the most important advantages of this technology.
Factory area-- 510000m2. Large production capacity,help customer improve the factory construction time and saving more cost.
Glasstex Prepainted wallcovering is the type painted during production to help customer save construction time labor cost and paint cost which is suitable for hurry scheduleproject Reduce labor cost Shorten construction time Simplify Construction procedure Wallcovering edge not easy damaged Easy to paste Painting 1….
Also, due to the standardized and all-in-one nature of SIPs, construction time can be less than for a frame home, as well as requiring fewer tradesmen.
Also, due to the standardized and all-in-one nature of SIPs, construction time can be less than framed basement walls, as well as requiring less manpower.
