Examples of using Construction time in English and their translations into Thai
{-}
-
Colloquial
-
Ecclesiastic
-
Ecclesiastic
-
Computer
Construction time is short.
Reduced labor cost and construction time.
Shortens construction time and lowers cost.
Higher Labor cost and construction time.
Construction time is largely dependent on the curing rate of the mixture.
Reinforcing Mesh reinforcement considerably reduces construction time.
Saving in construction time by selecting Elephant ZOLIDwall system.
Proprietary technology that helps to reduce construction time and keeps costs low.
Reduce construction time as it can be cut and connect immediately under constructional plan.
Developers, firstly, reduce the cost and construction time, and secondly.
Reduced construction time due to less underground work, fewer manholes and less pipework.
These installation systems save on material wastage and construction time.
If the construction time is long, the container house can be chosen as the workers' dormitories and camps. More.
Fast and easy installation greatly shorten the construction time which reduce the costs;
The outdoor wall decoration with heat preservation construction, which saves nearly ten working procedures and greatly saves construction time.
The buyer will be advised about the actual construction time by a detailed time schedule upon signing the contracts.
Product Name: temporary metal buildings prefab camp houses with short construction time.
Using such models can significantly reduce construction time at home, which is one of the most important advantages of this technology.
Masking: cover and cover the masking effect of latex paint better, less construction time consumption.
Short construction time, light deadweight, high strength, small cross section, wide application, well anti-seismic performance and beautiful appearance.
Factory area-- 510000m2. Large production capacity, help customer improve the factory construction time and saving more cost.
Short construction period: Compared with the construction time of concrete tanks for more than 90 days, the installation time of GFS leachate storage tanks is shorter, less than 15 days.
Our high quality, yet cost-effective concrete and nanomaterial products use a unique patented proprietary technology that helps to reduce construction time and keeps costs low.
Shorten construction time. Onekin precast panel is fast installation, with installation speed at least 40m2/day/worker. We have one project finishes in four month while origin plan for block will take one year.
As construction period is short, fabric cutting, seam welding, machining, can be made in one factory, which greatly reduce the construction work site and construction time.
GEL precast concrete walls can facilitate installation and contribute to reduction of both construction time and substantial cost by eliminating and on-site finishing.
Since construction carried out off-site, the on-site process is simplified and therefore makes for a safer working environment and a reduction in construction time, defects, material usage and on-site waste.
In addition to high power engine, enclosed rear warehouse could prolong the service life of the engine, the construction time greatly increased, large power, strong ability in operation.
In addition, the guardrail drill machine high-power engine and the enclosed rear bin extend the service life of the engine, and the construction time is greatly lengthened, the power is large, and the working ability is strong.
Reducing construction cycle time and improving productivity.