Examples of using Construction time in English and their translations into Arabic
{-}
-
Colloquial
-
Political
-
Ecclesiastic
-
Ecclesiastic
-
Computer
Construction time.
Reduces construction time.
Construction time: 5-6 days in sunny days.
Can greatly save the construction time.
Construction time: 20 -25 days in sunny days.
People also translate
It also greatly saves costs, construction time and labor.
Construction time: At least 4 hours to complete.
Convenient: Shorten the project construction time; Reduce temporaty support.
Construction time costs are an essential financial evaluation.
Precast foundations reduce construction time, as they are installed quickly.
The PVC Corner Bead is really a high efficient product with reliable performance and fast construction time.
The construction time for every unit is calculated like this.
If employed perfectly, BIM can minimize construction time, costs, and claims.
The construction time for every unit is calculated like this.
Large production capacity, help customer improve the factory construction time and saving more cost.
That construction time will be broken. The bill provides for mandatory.
Short repair time: no need to remove the tiles, the construction time is only 1/3 of the traditional.
Decreasing the construction time of residential units to ramp-up housing production.
With the button-type installation it needs no mechanical or accessory assembly,lead to saving construction time.
Also the construction time was saved at least 50% than traditional structure.
According to design requirement into all sorts of design,reduce the overall work process cost and shorten construction time.
It can save a lot of construction time compared to traditional floor decking system.
It can be regarded as the great innovation in building material industry,the good performance and fast construction time prove everything.
Shorter construction time results in savings in main contractors' overheads and financing cost.
Prefabricated construction, improve the work efficiency, shorten the construction time, construction costs and labor can be saved.
The construction time can be greatly shortened, no special tool is needed, and one person can complete the operation.
Mobile Concrete Batching Plantis specially designed for project with short construction time, long construction line, frequently changing construction site.
Short construction time, light deadweight, high strength, small cross section, wide application, well anti-seismic performance and beautiful appearance.
Yes, fabricated structural elements reduce the construction time by providing high quality, low prices, reduce labor costs, a long service life.
Although requiring some construction time, the elevation concept can be applied to a floating version if dry land for construction is scarce.