Examples of using Installation and testing in English and their translations into Bulgarian
{-}
-
Colloquial
-
Official
-
Medicine
-
Ecclesiastic
-
Ecclesiastic
-
Computer
Installation and testing of appliances;
The preparatory work before installation and testing.
Installation and testing of fiber optic links.
Industrial networks- design, installation and testing.
Installation and testing of power transformers.
Send your technicians to China to learn installation and testing.
Network installation and testing Commissioning and optimization.
Dispatching engineers overseas for equipments installation and testing.
Design, installation and testing of structural cable systemsand optical connections.
Dispatching engineer overseas guidance for equipment installation and testing.
Part 5: 2000 Installation and testing, instructions for operation, maintenance and use.
Junhong Electronic promises:1 year warranty for equipment from the date of the installation and testing.
Shore-side electricity supply for seagoing ships,including the design, installation and testing of the systems, shall comply with the technical specifications of the IEC/ISO/IEEE 80005-1 standard.
If the computer has modifications(listed above),then the manufacturer box is opened for installation and testing purposes.
Shore-side electricity supply for seagoing ships,including the design, installation and testing of the systems, shall comply with the technical specifications of the IEC/ISO/IEEE 80005-1 standard.
Manufacture of elements for hydraulic cylinders, hydraulic valves, hydraulic hand pumps and mechanical elements, installation and testing on the spot.
In the cases referred to in points(a) and(b) of paragraph 1, where the person responsible for the design and manufacture of the lift and the person responsible for the installation and testing of the lift are not the same, the former shall supply to the latter all the necessary documents and information to enable the latter to ensure correct and safe installation and testing of the lift.
The main activities include design and construction of a software system to monitor ship traffic, equipment centers,delivery, installation and testing of new vessels.
The procedures for the design and construction stages,as well as installation and testing phases can be carried out on the same lift.
The main activities include design and construction of a software system to monitor ship traffic, equipment centers,delivery, installation and testing of new vessels.
The procedures for the design and construction stages,as well as installation and testing phases can be carried out on the same lift.
Provide free machine installation and commissioning for the customer, by the new Ankai Corporation engineers in the transportation of customers designated place, in accordance with the new product acceptance specifications for installation of Ankai door for customers to provide on-site installation and testing machine operation, to ensure that customers purchase the products can be directly used, and complete machine inspection confirmation service.
Complete setup solution, logistics,technical data, interactivity, installation and testing, management and monitoring of the solution.
Haokun Company has constantly held the business philosophy of“Quality First, Abiding the Contract, Customer Orientation and Excellent Service” and wholeheartedly provides both domestic and overseas clients with services such as solutions to hard-nut problems in science and technology, packaged design,processing and manufacturing, installation and testing, technology transferand technological consulting, in areas of metallurgy, steel rolling, mining and environmental protection.
Long experience of specialists in the creation of products from the preliminary design to installation and testing in real objects, gives us the confidence that we can cope with any challenge.
Commissioning Authority(supervisory authority): a body responsible for supervising the design, installation and testing of all plant systems impacting energy consumption of the building;
The procedures for the design and construction stages,on the one hand, and the installation and testing stages, on the other, may be carried out on the same lift;
The procedures for the design and construction stages,on the one hand, and the installation and testing stages, on the other, may be carried out on the same lift;
The installation and annual testing of smoke detectors is also mandatory in companies.
The installation, installation and initial testing of the delivered equipment will last for 5 weeks;