Examples of using Monitoring methodology in English and their translations into Bulgarian
{-}
-
Colloquial
-
Official
-
Medicine
-
Ecclesiastic
-
Ecclesiastic
-
Computer
Temporary changes to the monitoring methodology.
Monitoring methodology not based on tiers.
Minimum content of the monitoring methodology plan.
Monitoring methodology for emissions from aviation activities.
Reporting on improvements to the monitoring methodology.
The monitoring methodology referred to in paragraph 2 may take into account expert analysis and shall include.
Companies will be able to select their preferred monitoring methodology.
Document the activity monitoring methodology, including how it is reported;
(iii) assessing potential measures for improvement of the monitoring methodology applied;
A monitoring methodology has been elaborated to define monitoring methods for indicator species and evaluation of the results.
(c) monitoring requirements,specifying monitoring methodology and frequency;
Where an operator applies a monitoring methodology not based on tiers, as referred to in Article 22 of Implementing Regulation(EU) 2018/2066, the verifier shall check the following.
Each operator oraircraft operator shall regularly check whether the monitoring methodology applied can be improved.
Dr. Rob Sheldon, will develop a comprehensive monitoring methodology for the Red-breasted Goose to be applied in all key range countries of the species.
Where components of the measuring systems cannot be calibrated,the operator shall identify those in the monitoring methodology plan and propose alternative control activities.
(b) in detail the interim monitoring methodology that the operator uses to determine the emissions until the conditions for the application of the tier in the monitoring plan have been restored;
The operator concerned shall notify the temporary change referred to in paragraph 1 to the monitoring methodology without undue delay to the competent authority, specifying.
The monitoring methodology plan shall comprise a detailed, complete and transparent documentation of all relevant data collection steps, and shall contain at least the elements laid down in Annex VI.
As a result of the implementation of the monitoring methodology, a Local Integrity System Index is elaborated annually.
(f) a description of the procedure for regular evaluation of the monitoring plan's appropriateness,including any potential measures for the improvement of the monitoring methodology and related procedures applied;
For ground water monitoring we employ a multi-level groundwater monitoring methodology, which allows for the collection of discrete samples from various depths.
Each operator or aircraft operator shall regularly check if the monitoring plan reflects the nature and functioning of the installation oraviation activity in accordance with Article 7 of Directive 2003/87/EC, and whether the monitoring methodology can be improved.
Where recommended improvements would not lead to an improvement of the monitoring methodology, the operator or aircraft operator shall provide a justification of why that is the case.
(3) where a fall-back monitoring methodology is applied in accordance with Article 22, a detailed description of the monitoring methodology applied for all source streams or emission sources, for which no tier methodology is used, and a description of the written procedure used for the associated uncertainty analysis to be carried out;
A description of the written procedure to be used for defining the monitoring methodology for additional aircraft types which an aircraft operator expects to use;
A detailed description of the monitoring methodology where transfer of inherent CO2 as part of a fuel in accordance with Article 48 or transfer of CO2 in accordance with Article 49 are carried out, where appropriate in the form of a description of the written procedures applied, including the following.
Where components of the measuringsystems cannot be calibrated, the operator shall identify those in the monitoring methodology plan and propose alternative control activities.
Measures relating to the improvement of an installation's monitoring methodology in accordance with Article 69 shall not be deemed to incur unreasonable costs up to an accumulated amount of EUR 2 000 per reporting period.
Where a methodology is used, which is not based on tiers, or where the highest tier methodologies are not met,operators should regularly report on the steps being taken to meet a monitoring methodology based on the tier system and to reach the highest tier required.
Measures relating to the improvement of an installation's monitoring methodology shall not be deemed to incur unreasonable costs up to an accumulated amount of EUR 2 000 per year.