Examples of using Draft guidelines for the preparation in English and their translations into French
{-}
-
Official
-
Colloquial
Draft guidelines for the preparation of the. .
Draft Guidelines for the Preparation of the EIS.
PROTOCOL ARTICLES 5, 7 AND 8: This group took up the draft guidelines for the preparation of the information required under Article 7.
Draft guidelines for the preparation of national.
Draft guidelines for the preparation of national.
At the same meeting, the SBI considered the report of the workshop to develop draft guidelines for the preparation of national adaptation programmes of action(NAPA) contained in document FCCC/SBI/2001/7.
Draft guidelines for the preparation of the information required.
DRAFT GUIDELINES FOR THE PREPARATION OF THE INFORMATION.
Draft Guidelines for the Preparation of an Environmental Impact Statement(EIS) issued.
Note: Clarification is required as to whether the report referred to in para. 2 above is additional to the report requested for the establishment of the initialassigned amount as defined in section III(modalities for accounting for assigned amount under Article 7, para. 4) of the draft guidelines for the preparation of the information required under Article 7 of the Kyoto Protocol annex II of documents FCCC/SBSTA/2000/10/Add.3 and FCCC/SBSTA/2000/13.
Draft Guidelines for the Preparation of the Environmental Impact Statement.
Note: Clarification is required as to whether the report referred to in this subparagraph is additional to the report requested for the establishment of the initial assigned amount as defined in section III(modalities for accounting for assigned amount under Article 7.4) of the draft guidelines for the preparation of the information required under Article 7 of the Kyoto Protocol Annex II of documents FCCC/SBSTA/2000/10/Add.3 and FCCC/SBSTA/2000/13.
O Draft Guidelines for the Preparation of the Environmental Impact Statement[PDF- 452 kb.
Note: Clarification is required as to whether the report referred to in this subparagraph is additional to the report requested for the establishment of the initial assigned amount as defined in section III(modalities for accounting for assigned amount under Article 7.4) of the draft guidelines for the preparation of the information required under Article 7 of the Kyoto Protocol Annex II of documents FCCC/SBSTA/2000/10/Add.3 and FCCC/SBSTA/2000/13.
Workshop to develop draft guidelines for the preparation of NAPAs(FCCC/SBI/2001/7.
Draft Guidelines for the Preparation of the Environmental Impact Statement of the Rabaska Project.