Examples of using Surface must in English and their translations into Slovak
{-}
-
Colloquial
-
Official
-
Medicine
-
Financial
-
Ecclesiastic
-
Official/political
-
Computer
-
Programming
The surface must be.
After alignment with the help of semi-heavy and its full drying(1-2 days), the surface must be primed again(betonokontaktom).
The surface must be well soaked.
Processed via their surface must be flat.
The surface must be able to….
People also translate
The working humidity of the air is at most 80%, and the surface must be heated at least 3 degrees above the dew point.
The surface must be afterwards burnished.
The branches facing the surface must be strictly vertical.
The surface must be clean and dry during application.
If it is necessary to apply Izollat to galvanized metal, the surface must be degreased first, since adhesion problems may occur.
The surface must be smooth, dry, dust and grease free.
The most important point in laying tile issurface preparation,whether it's flooring or wall- the surface must be perfectly flat.
Your work surface must be clean!
Surface must be dry and clean(remove any moisture, grease and dust).
With regular processing, the surface must retain its structure and initial appearance.
The surface must be cleaned, the existing cracks are patched and markings can be applied for the future relief composition.
In order to eventually under a new layer of wallpaperhave not started to appear grains and particles of filler,level surface must be thoroughly sanded.
First, the surface must be cleaned of course.
The surface must first be polished by an automatic system or robot.
The wood that is to bepainted must be dry and clean, so the surface must be cleaned from dust with a vacuum cleaner or brush before grinding.
Then the surface must be thoroughly washed with warm soapy water and cleaned with a cloth.
All irregularities should be removed, the surface must be perfectly smooth, so an additional primer coat is applied over the metal.
The surface must be 100% clean, flat and dry, and if the installation doesn't go too well, air bubbles can form.
The first step is the same- the surface must also be smooth and flat, for example, by using self-leveling screeds.
The surface must be cleaned, the existing cracks are patched and markings can be applied for the future relief composition.
Before insulating the garage doors, their surface must be thoroughly cleaned of dirt and rust, treated with degreasing compound, apply a primer coat.
After the surface must be primed or missed with white glue.
In winter, the surface must withstand loads of at least 100 kilograms per square meter.
Basal request: metal surface must be polished, or affect the bonding strength, to deal with the old metal surface clean.
After that, the surface must be thoroughly washed again with an ordinary detergent, dried, and only after that new layers of coloring agent can be applied to the ceiling.