Примеры использования Piping shall на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
The piping shall include as few joints as possible.
Pumps and accessory loading and unloading piping shall be located in the cargo area.
All piping shall be of a suitable material.
Pumps, compressors andaccessory loading and unloading piping shall be placed in the cargo area.
All piping shall be of suitable metallic material.
Where carbon-manganese steel is used, cargo tanks,pressure vessels of cargo refrigeration systems and cargo piping shall be constructed of finegrained steel having a specified minimum yield stress of not more than 355 N/mm2.
The piping shall be permanent steel or copper tubes.
The lining of every shell,shell fittings and piping shall be continuous, and shall extend around the face of any flange.
Piping shall be protected against corrosion both internally and externally.
The nominal size of the discharge piping shall be at least as large as that of the pressure relief device outlet.
Piping shall be protected against corrosion both internally and externally;
The metal fittings of the connections to the shore piping shall be electrically earthed so as to prevent the accumulation of electrostatic charges.
Piping shall be suitable supported with a maximum spacing of 1m between the supports.
Service equipment such as valves and external piping shall be so arranged that no substance remains in them after filling the portable tank.
Piping shall be designed, constructed and installed so as to avoid damage due to expansion and contraction, mechanical shock and vibration.
The shut-off devices of the loading and unloading piping shall be duplicated, one of the devices being constituted by a remote-controlled quick-action stop device.
Piping shall be designed, constructed and installed so as to avoid the risk of damage due to thermal expansion and contraction, mechanical shock and vibration.
After each unloading operating the cargo tanks and the cargo piping shall be emptied by means of the stripping system in accordance with the conditions laid down in the testing procedure.
Piping shall be designed, constructed and installed so as to avoid the risk of damage due to thermal expansion and contraction, mechanical shock and vibration.
If the provisions listed in 1.1.4.6.1 foreseethe application of a stripping system, the cargo tanks and the cargo piping shall be emptied by means of the stripping system in accordance with the conditions laid down in the testing procedure after each unloading operation.
All piping shall be of suitable metallic material.
When antiexplosion protection is required in column(17) of Table C of Chapter 3.2 in accordance with the list of substances of Appendix 4 in Chapter 3.2, Table C,column(17), cargo tanks and their piping shall be purged in an appropriate form of any air that may be present using inert gas and maintained in an airfree state.
The piping shall consist of fixed steel or copper tubing.
When anti-explosion protection is required in column(17) of Table C of Chapter 3.2 and inerting is required in column(20)of Table C of Chapter 3.2, cargo tanks and their piping shall be purged in an appropriate form of any air that may be present using inert gas and maintained in an air-free state.
The liquid remaining in the piping shall be completely drained into the cargo tanks, if possible, or safely removed.
Other piping shall enter the shell in its upper part; openings shall be situated above the highest permissible level of the phosphorus and be capable of being completely enclosed under lockable caps.
In all cases the efficiency of the cleaning of cargo tanks and their piping shall be monitored by means of appropriate tests or inspections to check that no trace of acid or alkaline substance remains that could present a danger in the presence of these substances.
The piping shall be accessible, appropriately fixed and protected at all points where there is a risk of impact or rubbing, particularly where they pass through steel partitions or metal walls.
The elements and the piping shall be tested at the periodicity defined in P200 and in accordance with the provisions described in 6.2.1.5.
The piping shall be readily accessible, properly fixed and protected at every point where it might be subjected to impact or friction, particularly where it passes through metal bulkheads or other metal partitions.