Примеры использования Testing is conducted на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
All testing is conducted on real devices.
It is well known that for the first 10-12 years testing is conducted in the atmosphere and underground.
Testing is conducted at any time convenient for you.
Acceptance of applications for participation in complex testing is conducted by admission committees of higher education institutions from 20 June to 9 July.
Testing is conducted from July 17 to July 23 in the basic universities.
The acceptable level of confidence orprobability should be decided before the testing is conducted but 95 per cent confidence/probability is normally used.
Testing is conducted on the basis of tests developed Certification Commission.
Comprehensive testing is conducted from 17 to 23 July;
Testing is conducted with the purpose to find program errors(bugs) before the users come across them.
In many PPUNT trial testing is conducted under the conditions as close possible to those that will be created during the UNT, CTA using classroom fund involved at UNT and CTA.
Testing is conducted once in two weeks within the prescribed period on the basis of the rules for regional testing center TIU.
Stress testing is conducted according to three crisis development scenarios.
Functional testing is conducted to verify whether the software performs the expected functions and complies with the declared requirements.
Comprehensive testing is conducted at the request of entering the Kazakh and Russian languages in volume of secondary education curricula in four subjects.
Testing is conducted on a computer or on paper, and lasts 3 hours and 45 minutes with the maximum possible score is 340 170 on Math and 170 on English.
Complex testing is conducted on the basis of points testing(basic higher education), the list of which is approved by order of the authorized body in the field of education.
Comprehensive testing is conducted on the basis of points testing(basic higher education), the list of which is approved by order of the authorized body in the field of education.
Comprehensive testing is conducted for graduates of general secondary education(secondary) of previous years, graduates of technical and vocational(primary and secondary vocational, post-secondary) education institutions, secondary school graduates who did not take part in the UNT, trained through international exchange students for abroad, graduates of national music boarding schools, as well as persons who have graduated from educational institutions abroad.
Testing was conducted on a group of patients with a completely different pathologies.
Methodology testing was conducted based on the statistics of three countries: U.S., Germany and France.
Testing was conducted under the following conditions: softened tap water is 250 ppm at 25 C.
Testing was conducted in six stages.
The testing was conducted from January to July 1972.
According to the Ministry of Education and Science,the Unifed National Testing was conducted in 165 centers.
The contestants went through two stages of examination of theoretical knowledge andpractical skills; testing was conducted online, participants had to answer 50 questions chosen by the computer automatically.
Testing was conducted in 8 testing points in the basic higher education institutions on the first day and in 38 points- on the second day, and 30- the third day.
Testing was conducted in the homes of the participants, and it was found that only 91% could complete the neuropsychological tests but that 100% completed the computerized ones.
The testing was conducted in four countries(Australia, Canada, Italy, US) using the protocol developed by the Task Force, as well as in a limited number of EU countries(Denmark, Spain) using protocols for tests of the European Health Interview Survey.
Low-temperature testing was conducted in Canada, Sweden(Arjeplog), and Russia(Moscow, Khabarovsk) while high-temperature tests took place in the US(Death Valley), Oman(Nizwa), Australia(Alice Springs), Spain(Barcelona), and Italy Nardò.
Work on improving the applied cable trunking and its testing was conducted in accordance with the Federal Grid Company's implementation plan to improve the explosion and fire safety of transformers and their chambers at the 500-kV substations of the Moscow Ring.