Examples of using Server virtualization in English and their translations into Arabic
{-}
-
Colloquial
-
Political
-
Ecclesiastic
-
Ecclesiastic
-
Computer
UCS Server Virtualization Features.
Experience working with Hyper-V and Server Virtualization concepts.
Al-Tameer offers server virtualization and shared storage solutions that put your organization in an ideal position for future growth.
Next-generation hypervisor-based server virtualization technology.
The lower than projected deployment of servers was due to the continuing drive for UNMISS server virtualization.
Owing to delay in the implementation of a server virtualization project intended to reduce the number of servers. .
Experience working with and an understanding of Microsoft Hyper-V and basic server virtualization concepts.
The implementation of the server virtualization project was not completed, owing to delays in the receipt of the requisite storage area network equipment.
The lower number was the result of aggressive use of server virtualization technology.
Server Virtualization: With Hyper-V in Windows Server 2016, it is easier than ever for organizations to gain cost savings from virtualization. .
Achieved; 90 per cent of the server virtualization project was completed during the 2008/09 period, which resulted in the reduction in the number of servers from 21 to 17.
Reduction in the number of servers inuse by 18 per cent by June 2009 through server virtualization technology(2007/08: 83; 2008/09: 68).
Furthermore, 90 per cent of the server virtualization project was completed, which led to the reduction of four servers, but with increased availability of network services.
Reduction in the total number of servers in the Mission(from 301 to 213),including the implementation of server virtualization programme, will result in savings estimated at $1,160,000.
Server Virtualization: With Hyper-V in Windows Server 2012, it is easier than ever for organizations to gain cost savings from virtualization. .
The higher number was attributable to the continued utilization of servers that had been scheduled for write-offaction as a result of the delayed implementation of the full server virtualization project.
Furthermore, the server virtualization project was completed, which led to the reduction in the total number of servers from 17 to 16 while the availability of network services was increased.
Reduction of 24 per cent(from the actual number of 72 in 2008/09), for a total of 55 servers by the end of June 2010,through the expansion of the server virtualization project.
The lower number was attributable to the implementation of the server virtualization project that enabled the effective utilization of server hardware and enhanced server network and disaster recovery planning.
Effective and efficient logistical, administrative and security 2.1.1 Reduction in the number of servers in use by 18 percent by June 2009 support to the Force through server virtualization technology(2007/08: 83; 2008/09: 68).
Server virtualization is a continuing project which is in line with guidelines of the Information and Communications Technology Division on reducing the overall number of assets and at the same time, reducing the Mission ' s carbon footprint.
The additional requirements were partly offset by reduced requirements for spare parts and supplies, owing to the decrease in the number of servers from 72 in the 2008/09 period to55 in the 2009/10 period as a result of the implementation of the server virtualization project.
Server virtualization project to consolidate servers in the Mission with the United Nations Logistics Base at Brindisi, Italy, and to improve the reliability of systems while avoiding data replication between the Mission and the United Nations Logistics Base D. Vacancy factors.
Further, the replacement of servers has been accelerated in thesecond half of 2012 with the advanced implementation of Server Virtualization Technology, while ageing physical servers are decommissioned and their functions and services migrated to virtualized hosts.
Reduction of 13 per cent in the number ofservers in use to 72 servers through the expansion of the server virtualization project; owing to the fact that UNIFIL was used as a pilot mission for the implementation of the virtualization project, the reduction in the number of servers was lower than planned as a result of time-consuming trial runs.
Based on experience gained in other missions, knowledge-sharing activities within the region are undertaken in a more timely manner andcan be applied to cutting-edge projects, such as server virtualization technology, being shared by regional Communications and Information Technology Sections for the benefit of all the missions in the region.
Several solar power back-up installation kits for communications and microwave equipment were installed andwork was undertaken on server virtualization to reduce carbon emissions by consuming less and reducing the use of information and communications technology equipment powered by diesel generators.
The unspent balance was primarily attributable to:(a) reduced requirements for spare parts for servers, resulting from the reduction in the number of servers arising from the implementation of the server virtualization technology; and(b) reduced requirements for software licenses, resulting from economies of scale achieved from high-volume purchases at Headquarters.
Connection to the national power grid, with generators being used only for back-up, leading to reduction in fuel consumption; reduction in mobile telephone usage through issuance only to staff handling emergencies ortravelling long distances; server virtualization project to consolidate servers in the Mission with the United Nations Logistics Base and to improve reliability of systems, while avoiding data replication between the Mission and the Logistics Base.