Examples of using Pre-selection in English and their translations into Chinese
{-}
-
Political
-
Ecclesiastic
-
Programming
The first role is pre-selection.
Pre-selection proceedings 47-50 18.
So its proposition is automatic pre-selection across“thousands” of potential job applicants.
Pre-selection of bidders(legislative recommendation 2 and paras. 39-56).
In reaching that decision, the contracting authority shall applyonly the criteria that are set forth in the pre-selection documents.
The format of the pre-selection application is also a question.
In drawing up the list, the contracting authority shall apply only themanner of rating that is set forth in the pre-selection documents.
(a) The pre-qualification or pre-selection documents, if any, shall set out a description of the subject matter of the procurement;
That was reflected in model provision 6, paragraph 1,which stipulated that the contracting authority" shall engage in pre-selection proceedings".
In this connection, the Department aims at intensifying a pre-selection exercise of the occupational groups required for staffing of missions.
For the purpose of limiting the number of suppliers or contractors from which to request proposals,the procuring entity may engage in pre-selection proceedings.
There is a lot of pre-selection before anyone even comes out here,” says drawing professor Mark Taggart, a 12-month resident of Cortona.
For the explanation of the terms" solicitation","supplier or contractor"," pre-qualification" and" pre-selection", see 79, 85, 53 and 55 below[**hyperlinks**].
The price charged for the pre-selection documents should only reflect the cost of printing such documents and providing them to the bidders.
A contracting authority should not impose any criterion, requirement or procedure with respect to the qualifications of bidders thathas not been set forth in the pre-selection documents.
Doubts were expressed, however, as regards the extent to which pre-selection could be regulated so that it was carried out in an impartial and objective manner.
On this last subject, when a donor had indicated that it could finance a new project,it received 19 proposals without a pre-selection or prioritization by UNCTAD.
It was noted that open tendering with prequalification or pre-selection might achieve the same purposes as restricted tendering in a more transparent manner.
From September 11 to 15, international judges from 10 countries assessed thetop coffees that passed through a rigorous screening from pre-selection to the national jury stage.
I also urge MemberStates to take further steps to enhance the pre-selection and training of civilian police officers and to commit strongly to their operational preparedness.
Mr. Estrella Faria(Secretariat) said that the original legislative recommendation had contained arequirement that the bidder should demonstrate that it met the pre-selection criteria.
The contracting authority shall engage in pre-selection proceedings with a view to identifying bidders that are suitably qualified to implement the envisaged infrastructure project.
Mr. Fruhmann(Austria), referring to article 14(1), said that the drafting group proposed that the word"in" be inserted before the words" the pre-qualification or pre-selection documents".
The contracting authority[may][shall] engage in pre-selection proceedings with a view to identifying bidders that are suitably qualified to implement the envisaged infrastructure project.
After the subsequent discussion, the Secretariat was entrusted with redrafting the provisions of paragraph(2),taking into account the need to preserve flexibility and transparency in regulating pre-selection.
(c) Where pre-selection proceedings have been engaged in, to each pre-selected supplier or contractor in accordance with the procedures and requirements specified in the pre-selection documents;
In this respect, the provisions of subparagraphs(a) to(c)that addressed issues specific to the pre-selection procedure, and a cross-reference to the procedures in article 16 were considered appropriate.
(b) Mandated procedures for: pre-selection, participation of consortia, methods and techniques(single-stage, two-stage, single-source, negotiations); comparison and evaluation of proposals;
The emergency situations mentioned by the representative of the United States included cases where the concessionaire,having qualified through a pre-selection procedure, failed to perform the works and had to be replaced.