Examples of using Base layer in English and their translations into Croatian
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
We call it a base layer.
Base layer: Customers' request.
Application of the base layer.
Base layer: Customers' request.
Now you can apply a base layer.
Base layer: Customers' request.
The polymer composition as the base layer.
Base layer: Customers' request.
The next step- priming of the base layer.
Base layer had traces of concrete.
Application of the base layer from the mortar pouring mixture.
Base layer can serve as a concrete base. .
The initial smoothness is very important for the base layer.
On the base layer is glued with 3d effect Image.
Country Charm is a collection of products available in 14 mm thickness(10 mm base layer- birch plywood); 90 mm wide.
The base layer is a continuous coating is applied by pouring.
Look great pictures on the base layer of"natural" colors: blue, green, blue.
The base layer is the basis for the middle and finish layers. .
When heated to a high temperature,synthetic fabrics worn as a base layer release clothing toxins directly into the skin.
The base layer- specific continuous coating(No defects on it), which is applied by pouring.
The Detail Abrasive Brushes have very flexible bristles which allow removal of the exterior“surface layer” without damaging the base layer below.
The base layer is considered to be a continuous coating layer without the presence of visible defects.
Generally, a single-sided panel is composed of a three-layer structure, which is a circuit layer(copper foil),an insulation layer, and a metal base layer.
The bronzer acts as a base layer that helps diffusion of the pigment of the blush so it does not look too sharp.
Insulation for uniform unheated structures The foundations, substructure andfloors of unheated structures can be at risk of frost heave if the base layer is not kept frost free.
If used as a base layer polymer flooring itself, it needs to be fixed along the walls damper tape and prepare a solution.
But if the self-leveling floor will include exclusively natural materials, the base layer will serve as the background, so it must be set to maximum quality and appropriately painted.
The base layer(2-3mm thick) is applied byAfter 6-12 hours after priming, when will the application of the polyurethane floor and in 12-17 hours, if the application to be an epoxy floor.
When brushing waterproof coating, use one horizontal and one cross roller brush to ensure that there is no missing or missing coating, andensure that it is firmly bonded with the base layer.
Either the image is applied to the base layer using acrylic paints, or else use the banner or vinyl with a ready pattern.