Examples of using The functional test in English and their translations into German
{-}
-
Colloquial
-
Official
-
Ecclesiastic
-
Medicine
-
Financial
-
Ecclesiastic
-
Political
-
Computer
-
Programming
-
Official/political
-
Political
The functional test usually starts with a smoke test. .
Everything that is beyond the 100 Km,We are interested only in the functional test.
The functional test is often also combined with an in-circuit test. .
Only when the blinking of the signal SYS has stopped you can go ahead with the functional test.
If the functional test goes well, we send the gear unit to the paint shop Fig.
We can plan the regression test that we need the same time as for the functional tests.
The functional test is an integral part of quality assurance and is developed by our engineers.
Our standard range of products comprises mechanical andpneumatic test adapters for the functional test of assemblies, components and equipment.
The functional tests are developed in full accordance with the requirements of the technical standards EN 1069/1 and 2.
It is recommended to select the shortest time when setting the detection zone and for the functional test.
Our comparison measurement comprises in addition to the functional test the sensor calibration of your device at our factory calibration unit.
The functional test is obligatory for all products approved according to DIN EN 352 and must be carried out in line with the manufacturer's specifications.
This last screen will be paid with a single side wire, sothat you can uncover to access components and then close during the functional test.
Even the functional test of electrical and electronic components, such as the analysis of power lines of a substation, is included here.
Both groups of technical goals aim to achieve continuity andwill ensure interoperability in the functional tests of aircraft.
The functional test of such complex control units and their networking within the vehicle architecture presents a particular challenge in.
These include the ICT tests(in-circuit test), Boundary SCAN, programming, high-voltage tests(HV-Test),burn-in tests and the functional test.
The functional tests of the R+D team support the product developers and receiving inspectors in examining materials and products.
Employees of the company support truck operators in the start-up of the measuring and sampling system,from the connection through the functional test through the final documentation.
In the functional test it is important to contact the terminals and connectors of the device fast and securely, so that within short time and with little expense the system can be examined in full.
If the interfaces provided by the customer are notfunctional at the time of final acceptance/ commissioning, the functional test of the machine is considered as the final acceptance or commissioning by us.
Operation of approx. 2 lux.(factory setting is daytime operation.) The adjustment screwmust be at the left stop position when setting the detection zone and for the functional test in daylight.
To eliminate variability between product units the functional test process is integrated with the traceability database and equipped with algorithms for automatic product calibration based on the BIN placed on the serialized PCB assembly.
Factory setting is daytime operation. The adjustment screw must beat the left stop position when setting the detection zone and for the functional test in daylight.
During the implementation phase, TÜViT took on the role of QualityAssurance Officer, planned and supported the contractor controlling, and was operationally involved in the functional tests and change management.
In addition to the functional tests of the cross-technology battery charging system SLH 300 from Jungheinrich and the car-like EASY Drive steering wheel from Still, the MULTIplus shelves from Schulte Lagertechnik, which were specially developed for e-commerce warehouses, were put to the test. .
This means in particular that the total system is already on the date of declaration of operational readiness and essentially free of defects,providing that the customer has the time to do the functional test by the contract completion date.
If a defect should later emerge,which was not identifiable during the inspection and the functional test, the buyer must provide written notice of the defect to RIEZLER within 5 business days after its discovery, otherwise the goods shall also be regarded as approved with respect to this defect.
