Examples of using Backfill in English and their translations into Russian
{-}
-
Official
-
Colloquial
Backfilling of septic tanks.
Equipment pedestals have been concreted and backfilled.
Backfilling of the trench requires close attention.
The Makeni area would be backfilled by a company from a Bangladeshi battalion.
Simultaneous operations of trenching,laying cables and backfilling with concrete.
The backfill shall be compacted after each layer of about 300 mm.
From 1995 to 2000- Head of the backfill plant JSC"Hurricane Kumkol Munal».
For backfilling is possible to prepare this infusion of herbs.
Then come to clean the remnants of the old toner and the new backfill material.
Makeni would be backfilled by a company from a Bangladeshi battalion.
The bucket mode is designed for the efficient handling of all backfill materials.
The backfill area helps with diversion of runoff and protects the masonry.
Separation of moisture occurs in the area of wall drainage and drainage backfill materials.
As backfill used antiseptics and biologically active compounds.
On completion the grillage was backfilled with sod peat to protect the timber from decay.
Backfilling of the open pits of common commercial minerals, route reserves, sor lows.
Excavating and treating contaminated soil using HTTD, followed by backfilling the cleaned soil;
Inadequate backfill materials, 2. not compaction, insufficient drainage.
The Nonius SB System enables automation of bottom facilities backfill by means of dump scows.
Is the brick wall or backfill area protecting the spring faulty or eroded?
Seminar on:"Weir Technology: hydraulic transport,paste thickening, backfill, drainage, pressure leaching.
This geocell was backfilled with 4-20mm LECA light expanded clay aggregate.
After forming the trenches of necessary width anddepth it's carried a backfill of sandy base under the base of the foundation.
Assessment should be made during installation and where necessary additional measures,such as corrosion resistant backfill used.
Definition of methods for backfilling data missed or lost as a result of equipment failure;
There are three main factors for failure to any artificial grass base constructions:1. Inadequate backfill materials, 2.
Construction of new infrastructure(sanitary backfills, composting and incineration plants);
One method involves producing a dust-free, crumbly solid or granules, which is then, for example, transported underground via a downpipe andsupplied as backfill.
The size of maximum loading bearing is just the same as standard bearing, while with backfill trough in the inside and outside, which can add the balls, and improve the maximum load at the same time.
The actual economic depth will of course depend on local parameters, such as the type of peat, the area of the peatland,the cost of the backfill material, availability of spoil areas, etc.