Examples of using Backfill in English and their translations into Arabic
{-}
-
Colloquial
-
Political
-
Ecclesiastic
-
Ecclesiastic
-
Computer
Backfill measures.
Package: PET film backfill in a class 100 environment.
Backfill for exposed pipeline at MOL K63.
Million to provide backfill for 66 subject matter experts.
On photo-one more variant devices for manual tamping backfill.
The backfill is cohesive soil.
Road jobs which include the following:(digging jobs- backfill- asphalt).
Ditch, backfill and hoisting;
Vacuum-sealed containers with nitrogen backfill in a class 100 environment.
Excavation, backfill, asphalt and Infrastructure networks.
These machines are ideal for trenches, road construction, backfill, and foundation work.
(4) For retaining wall backfill reinforcement, or for anchored retaining wall panel.
Package: Vacuum-sealed containers with nitrogen backfill in a class 100 environment.
Operate radius small, can work insmall area, suitable for groove backfill;
Permeability ensuring drainage of backfill and no hydrostatic pressures behind the wall.
Operate radius small, can work insmall area, suitable for groove backfill.
This backfill ensures a fresh smell, and the moisture that gets on it will quickly be absorbed.
Operating radius is small, can work ina small area, suitable for groove backfill;
The type of backfill used depends on the specific mineralogy and geotechnical requirements.
FPCCP excellent mechanical properties, lower requirements for foundation and backfill, reducing construction.
In the basement wall backfill, it can protect against damage to buildings and waterproof layer.
The standard configuration of the dozer can level the site, earth backfill, increase the stability of the machine;
Compact design and good performance, operate radius small, can workin small area, suitable for groove backfill.
Yes, and the dust from the dry expanded clay backfill is not as allergenic as the one that gives dry cement.
The pits and backfill material also pose a risk of contamination to groundwater where the pits are located above the aquifers.
The standard configurationof bulldozer shovel can level the land, earth backfill, increase the stability of the whole machine.
The first layer of backfill is guaranteed to be compacted before proceeding to the next step, and the layered backfill must be compacted.
Materials that are difficult to becompacted by road roller under static action, such as backfill rock that can be compacted with large particle size.
The roller compactor is relatively cost-effective, compacted backfill, compacted asphalt, pressed groove, crushed stone with high efficiency and wide application range;
Without protection,root barrier membranes can be damaged during the backfill process, or they can break down over time due to groundwater and soil chemicals.

