Examples of using Backfill in English and their translations into Thai
{-}
-
Colloquial
-
Ecclesiastic
-
Ecclesiastic
-
Computer
Carbon content of backfill coke powder>= 98.
It has strong power and usually has mechanical backfill function.
The backfill will be started in year.
A more practical option- backfilling with gravel.
I can backfill almost any detail that John throws out, but it takes time.
Consumption rate of MMO/Ti anode wire( with backfill materials).
For retaining wall backfill reinforcement, or for anchored retaining wall panel.
Mini Vibratory Road Roller mainly used in compaction the trench and backfill.
Make the bottom of the pit backfilling layers of sand and expanded clay.
Generally used in soils of 2000 ohm-cm or less with prepared gypsum-clay backfill.
Independent installation, which does not need to embed, backfill, and save construction costs.
In the basement wall backfill, it can protect against damage to buildings and waterproof layer.
So when we're in the fourth period, in the d-block, we're backfilling the third shell.
Laying the geotextile before backfilling sand will prevent growth of weeds between tiles.
Their work consists in the fact that after the use of excrement backfilled portion milled peat.
To a clay backfill could truly be considered"locked", it should be stacked layers of 10-15 cm and carefully to stamp each layer.
The Baby Road Roller Machine is mainly used for compact asphalt, broken stone, backfill and concrete etc.
Padded between soil and backfill material geotextile optimizes the seal so that the bulk material is practically not penetrate into the soil.
Steel drum roller has small operate radius, can work in small area, suitable for groove backfill;
Upon completion of the work on laying the tile joints backfilled with a layer of cement-sand mixture and pour water.
So an electron would rather go to another shell, which is the fourth shell, rather than backfill the 3d shells.
During the backfilling of pipe culvert, passageway, bridge abutment and other structures in highway construction, the large roller cannot be used for compaction in the working area.
Thank you for taking the time to fully explain to me what happened with the images and the*backfilling* process.
Small road roller mainly used to compacting and maintaining various roads in narrow area conditions: building construction, backfilling for pipeline, gymnasium ground pipeline channel and drainage trench etc, mainly used in compaction of trench and backfill.
Kg ride on vibratory roller has small operate radius, can work in small area, suitable for groove backfill;
The standard configuration of bulldozer shovel can level the land, earth backfill, increase the stability of the whole machine.
Fabric Housing: a continuous non-degrading fabric, allows water and vapors to pass, but contains the coke backfill.
That's not what I want to do here, but that was a good question, as to why do you go and backfill the third shell when we're in the fourth period?
Compact design and good performance, operate radius small, can work in small area, suitable for groove backfill.
Now we need to determine the volume of construction: the soil to be dug and removed from the territory area, sand for backfilling foundation stones and pebbles for decoration banks and bottom.